My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-140 <br />1-10.2 Traffic Control Management <br />1-10.2(1) General <br />Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the <br />following: <br />The primary and alternate TCS shall be certified as worksite traffic control <br />supervisors by one of the organizations listed below: <br />• Evergreen Safety Council (800) 521-0778 <br />• Northwest Laborers Union (800) 240-9112 <br />• American Traffic Safety Services Association (877) 642-4637 <br />1-10.2(2) Traffic Control Plans <br />Delete the first paragraph of 1-10.2(2) and substitute the following: <br />Contractor may use City’s Standard Traffic Control Plans included in COE <br />Standard Drawings, Series 700. The City does not represent or warrant that the <br />Standard Plans are sufficient, adequate or complete for the Contractor’s means, <br />methods or plan of Work. If a new or additional Traffic Control Plan is necessary, <br />prepare detailed Traffic Control Plan complying with COE Standard Drawings, <br />Series 700, the MUTCD, Part 6, and the most current edition of the PROWAG <br />(Public Rights-of-Way Accessibility Guidelines). Plan preparation shall be at <br />Contractor’s sole cost and submitted to the City for approval at least 14 calendar <br />days before starting Work. Work may not begin until Contractor is in receipt of City <br />approved Traffic Control Plan. <br />1-10.3 Traffic Control Labor, Procedures and Devices <br />Delete 1-10.3 and substitute the following: <br />1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br />(******) <br />1-10.3(1) General <br />The Contractor shall provide all flaggers, signs and other traffic control devices. The <br />Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br />and other traffic control devices necessary to warn and protect the public at all times <br />from injury or damage as a result of the Contractor's operations that may occur on <br />highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br />all necessary signs and traffic control devices are in place. <br />Flaggers and spotters shall possess a current flagging card issued by the State of <br />Washington, Oregon, Montana, or Idaho. The flagging card shall be immediately <br />available and shown upon request by the City. <br />1-10.3(2) Maintenance and Protection of Traffic Control <br />When the Bid proposed includes an item for "Maintenance and Protection of Traffic <br />Control", the Work required for this item shall be to: <br />1. Furnish and maintain signs, cones, barricades, flasher, and other <br />channelization devices; <br />2. Provide supervisory personnel for all labor for traffic control; <br />3. Provide labor and necessary vehicle(s) for set-up and removal of construction <br />signs and the traffic control devices that are placed daily; <br />4. Provide labor and vehicles for patrolling and maintaining in position all of the <br />construction signs and the traffic control devices; <br />5. Provide labor, material, and equipment necessary for cleaning up, removing <br />and replacing all construction signs and traffic control devices that are <br />destroyed, damaged or lost during the life of the project;
The URL can be used to link to this page
Your browser does not support the video tag.