Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div P – PROPOSAL March 2024 <br />Work Order No. UP 3814 SP-5 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit <br />price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto . All <br />entries must be typed or entered in ink. <br />BID SCHEDULE A <br />(Madrona Ave. Site) <br />BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />A01 Mobilization LS 1 $ $ <br />A02 Surveying LS 1 $ $ <br />A03 Spill Prevention, Control & Countermeasures <br />(SPCC) Plan LS 1 $ $ <br />A04 Force Account FA 30,000 $ 1.00 $ 30,000.00 <br />A05 Record Drawings (Minimum Bid $3,000) LS 1 $ $ <br />A06 Community Project Liaison LS 1 $ $ <br />A07 Potholing EA 14 $ $ <br />A08 Traffic Control Labor HR 840 $ $ <br />A09 Traffic Control - Off-Duty Police Officer FA 1,000 $ 1.00 $ 1,000.00 <br />A10 Maintenance and Protection of Traffic Control LS 1 $ $ <br />A11 Trench Excavation Safety Systems SF 14,100 $ $ <br />A12 Street Cleaning and Sweeping HR 60 $ $ <br />A13 Erosion/Water Pollution Control FA 6,000 $ 1.00 $ 6,000.00 <br />A14 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Up to 6-inch Thickness LF 50 $ $ <br />A15 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Additional 1-inch Thickness LF 50 $ $ <br />A16 Saw-cutting Concrete Pavement, <br />Final Joint Cut, Up to 8-inch Thickness LF 3,150 $ $ <br />A17 Saw-cutting Concrete Curb & Gutter, <br />Sidewalk, and Driveway LF 250 $ $ <br />A18 Foundation Material, Class A or B TON 140 $ $ <br />A19 Gravel Borrow Incl. Haul TON 3,890 $ $