My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div P – PROPOSAL March 2024 <br />Work Order No. UP 3814 SP-5 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit <br />price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto . All <br />entries must be typed or entered in ink. <br />BID SCHEDULE A <br />(Madrona Ave. Site) <br />BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />A01 Mobilization LS 1 $ $ <br />A02 Surveying LS 1 $ $ <br />A03 Spill Prevention, Control & Countermeasures <br />(SPCC) Plan LS 1 $ $ <br />A04 Force Account FA 30,000 $ 1.00 $ 30,000.00 <br />A05 Record Drawings (Minimum Bid $3,000) LS 1 $ $ <br />A06 Community Project Liaison LS 1 $ $ <br />A07 Potholing EA 14 $ $ <br />A08 Traffic Control Labor HR 840 $ $ <br />A09 Traffic Control - Off-Duty Police Officer FA 1,000 $ 1.00 $ 1,000.00 <br />A10 Maintenance and Protection of Traffic Control LS 1 $ $ <br />A11 Trench Excavation Safety Systems SF 14,100 $ $ <br />A12 Street Cleaning and Sweeping HR 60 $ $ <br />A13 Erosion/Water Pollution Control FA 6,000 $ 1.00 $ 6,000.00 <br />A14 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Up to 6-inch Thickness LF 50 $ $ <br />A15 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Additional 1-inch Thickness LF 50 $ $ <br />A16 Saw-cutting Concrete Pavement, <br />Final Joint Cut, Up to 8-inch Thickness LF 3,150 $ $ <br />A17 Saw-cutting Concrete Curb & Gutter, <br />Sidewalk, and Driveway LF 250 $ $ <br />A18 Foundation Material, Class A or B TON 140 $ $ <br />A19 Gravel Borrow Incl. Haul TON 3,890 $ $
The URL can be used to link to this page
Your browser does not support the video tag.