Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div P – PROPOSAL March 2024 <br />Work Order No. UP 3814 SP-8 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit <br />price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto . All <br />entries must be typed or entered in ink. <br />BID SCHEDULE B <br />(Beverly Lane Site) <br />BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit <br />Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />B01 Mobilization LS 1 $ $ <br />B02 Surveying LS 1 $ $ <br />B03 Spill Prevention, Control & Countermeasures <br />(SPCC) Plan LS 1 $ $ <br />B04 Force Account FA 12,000 $ 1.00 $ 12,000.00 <br />B05 Record Drawings (Minimum Bid $1,500) LS 1 $ $ <br />B06 Community Project Liaison LS 1 $ $ <br />B07 Potholing EA 8 $ $ <br />B08 Traffic Control Labor HR 560 $ $ <br />B09 Maintenance and Protection of Traffic Control LS 1 $ $ <br />B10 Trench Excavation Safety Systems SF 3,250 $ $ <br />B11 Street Cleaning and Sweeping HR 35 $ $ <br />B12 Erosion/Water Pollution Control FA 3,000 $ 1.00 $ 3,000.00 <br />B13 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Up to 6-inch Thickness LF 3,400 $ $ <br />B14 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Additional 1-inch Thickness LF 10,160 $ $ <br />B15 Saw-cutting Concrete Curb & Gutter, <br />Sidewalk, and Driveway LF 290 $ $ <br />B16 Foundation Material, Class A or B TON 100 $ $ <br />B17 Gravel Borrow Incl. Haul TON 2,130 $ $ <br />B18 Crushed Surfacing Base Course TON 40 $ $ <br />B19 Controlled Density Fill (CDF) CY 150 $ $