Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div P – PROPOSAL March 2024 <br />Work Order No. UP 3814 SP-11 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the un it <br />price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto . All <br />entries must be typed or entered in ink. <br />BID SCHEDULE C <br />(52nd Street & Evergreen Way Site) <br />BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit <br />Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />C01 Mobilization LS 1 $ $ <br />C02 Surveying LS 1 $ $ <br />C03 Spill Prevention, Control & Countermeasures <br />(SPCC) Plan LS 1 $ $ <br />C04 Force Account FA 5,000 $ 1.00 $ 5,000.00 <br />C05 Record Drawings (Minimum Bid $1,200) LS 1 $ $ <br />C06 Community Project Liaison LS 1 $ $ <br />C07 Potholing EA 2 $ $ <br />C08 Traffic Control Labor HR 320 $ $ <br />C09 Traffic Control - Off-Duty Police Officer FA 7,200 $ 1.00 $ 7,200.00 <br />C10 Maintenance and Protection of <br />Traffic Control LS 1 $ $ <br />C11 Trench Excavation Safety Systems SF 3,280 $ $ <br />C12 Street Cleaning and Sweeping HR 20 $ $ <br />C13 Erosion/Water Pollution Control FA 1,000 $ 1.00 $ 1,000.00 <br />C14 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Up to 6-inch Thickness LF 1,360 $ $ <br />C15 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Additional 1-inch Thickness LF 4,080 $ $ <br />C16 Saw-cutting Concrete Curb & Gutter, <br />Sidewalk, and Driveway LF 280 $ $ <br />C17 Foundation Material, Class A or B TON 40 $ $ <br />C18 Gravel Borrow Incl. Haul TON 1,060 $ $ <br />C19 Crushed Surfacing Base Course TON 40 $ $