My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div P – PROPOSAL March 2024 <br />Work Order No. UP 3814 SP-14 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the un it <br />price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto . All <br />entries must be typed or entered in ink. <br />BID SCHEDULE D <br />(75th Street & Evergreen Way Site) <br />BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />D01 Mobilization LS 1 $ $ <br />D02 Surveying LS 1 $ $ <br />D03 Spill Prevention, Control & Countermeasures <br />(SPCC) Plan LS 1 $ $ <br />D04 Force Account FA 3,000 $ 1.00 $ 3,000.00 <br />D05 Record Drawings (Minimum Bid $1,000) LS 1 $ $ <br />D06 Community Project Liaison LS 1 $ $ <br />D07 Potholing EA 3 $ $ <br />D08 Traffic Control Labor HR 180 $ $ <br />D09 Traffic Control – Off-Duty Police Officer FA 13,500 $ 1.00 $ 13,500.00 <br />D10 Maintenance and Protection of <br />Traffic Control LS 1 $ $ <br />D11 Trench Excavation Safety Systems SF 360 $ $ <br />D12 Street Cleaning and Sweeping HR 10 $ $ <br />D13 Erosion/Water Pollution Control FA 1,000 $ 1.00 $ 1,000.00 <br />D14 Saw-cutting Asphalt Concrete Pavement, <br />Final Joint Cut, Up to 6-inch Thickness LF 275 $ $ <br />D15 Foundation Material, Class A or B TON 10 $ $ <br />D16 Controlled Density Fill (CDF) CY 90 $ $ <br />D17 Class 52 Ductile Iron Pipe for Watermain, 6- <br />inch LF 25 $ $ <br />D18 Class 52 Ductile Iron Pipe for Watermain, <br />12-inch LF 66 $ $
The URL can be used to link to this page
Your browser does not support the video tag.