Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div P – PROPOSAL March 2024 <br />Work Order No. UP 3814 SP-18 <br />SUBCONTRACTORS FORM <br /> <br />1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and <br />electrical work (as defined by RCW Chap. 19.28), and structural steel installation and rebar <br />installation, Bidder MUST either identify itself or Subcontractors in the chart below. If Bidder <br />believes such work is not part of the scope of Work, Bidder shall write “NO WORK.” <br />2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br />Subcontractors vary with bid alternates, in which case the Bidder must indicate which <br />Subcontractor will be used for which alternate. <br />3. Bidder’s bid shall be deemed nonresponsive and void if: <br />A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel <br />installation and rebar installation, Bidder fails (1) to submit as part of the Bid the names <br />of such Subcontractors, (2) to name itself to perform such Work, or (3) to write “No <br />Work”; or <br />B. Bidder names two or more Subcontractors to perform the same work. <br />4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br />plumbing, electrical, structural steel installation and rebar installation subcontractors applies <br />only to proposed heating, ventilation and air conditioning, plumbing, electrical, structural steel <br />installation and rebar installation subcontractors who will contract directly with the general <br />contractor submitting the Bid to the City. <br />5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart below <br />must be submitted with the bid proposal or within one hour of the published bid submittal time. <br />6. The structural steel installation and rebar installation portions of the chart below must be <br />submitted with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> <br />Type/Scope of Work <br />Name and Address of Subcontractor/Or <br />Bidder <br />HEATING <br />Subcontractor, bidder or “no work” <br />MUST be stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” <br />MUST be stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or “no work” <br />MUST be stated <br /> <br />ELECTRICAL (as described in <br />RCW Chap. 19.28) <br />Subcontractor, bidder or “no work” <br />MUST be stated <br /> <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or “no work” <br />MUST be stated <br /> <br />REBAR INSTALLATION <br />Subcontractor, bidder or “no work” <br />MUST be stated <br /> <br /> <br />