My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 TABLE OF CONTENTS March 2024 <br />Work Order No. UP 3814 SP-i <br /> <br />CITY OF EVERETT, WASHINGTON <br />SPECIFICATIONS, PROPOSAL, AND CONTRACT DOCUMENTS <br />FOR <br />WATER MAIN REPLACEMENT “Y” – Phase 1 <br />WORK ORDER NO. UP 3814 <br />TABLE OF CONTENTS <br /> <br />NOTICE TO CONTRACTORS .............................................................................................SP-1 <br />DIVISION P – PROPOSAL ....................................................................................................SP-3 <br />BID SCHEDULE A ........................................................................................................ SP-5 <br />BID SCHEDULE B......................................................................................................... SP-8 <br />BID SCHEDULE C....................................................................................................... SP-11 <br />BID SCHEDULE D ...................................................................................................... SP-14 <br />BID SCHEDULE SUMMARY..................................................................................... SP-16 <br />PROPOSAL SIGNATURE SHEET ............................................................................. SP-17 <br />SUBCONTRACTORS FORM ..................................................................................... SP-18 <br />SECTION 00 4539 – RCW 35.22.650 CERTIFICATION ........................................... SP-19 <br />NON-COLLUSION AFFIDAVIT ................................................................................ SP-21 <br />NOTICE TO ALL BIDDERS ....................................................................................... SP-21 <br />BID DEPOSIT ............................................................................................................... SP-22 <br />BID BOND .................................................................................................................... SP-22 <br />DIVISION B – BID ITEM DESCRIPTIONS .....................................................................SP-25 <br />DIVISION C – CONTRACT AND BONDS ........................................................................SP-41 <br />CONTRACT ................................................................................................................. SP-41 <br />PAYMENT BOND ....................................................................................................... SP-45 <br />PERFORMANCE BOND ............................................................................................. SP-46 <br />DIVISION 1 – GENERAL REQUIREMENTS ..................................................................SP-47 <br />1-01 DEFINITIONS AND TERMS .......................................................................... SP-48 <br />1-02 BID PROCEDURES AND CONDITIONS ...................................................... SP-52 <br />1-03 AWARD AND EXECUTION OF CONTRACT .............................................. SP-58 <br />1-04 SCOPE OF THE WORK .................................................................................. SP-61 <br />1-05 CONTROL OF WORK ..................................................................................... SP-66 <br />1-06 CONTROL OF MATERIAL ............................................................................ SP-82 <br />1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC........... SP-84 <br />1-08 PROSECUTION AND PROGRESS............................................................... SP-103 <br />1-09 MEASUREMENT AND PAYMENT............................................................. SP-121 <br />1-10 TEMPORARY TRAFFIC CONTROL ........................................................... SP-139 <br />1-11 MISCELLANEOUS ........................................................................................ SP-144
The URL can be used to link to this page
Your browser does not support the video tag.