Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-80 <br />payable. If requested by the City, the Contractor shall promptly furnish proof of <br />payment of such accounts to the City. <br />1-05.18(3)D Attention to Work <br />The Contractor, either in person or acting through its representative, shall give <br />personal attention to and shall manage the Work so that it shall be prosecuted <br />faithfully and completed under the Project schedule. When its representative is not <br />personally present at the Project site, its designated alternate shall be available <br />and shall have the authority to act in matters relating to this Contract. <br />Where detailed construction requirements are not set forth in the Standard <br />Specifications or these Special Provisions, the Contractor shall perform the Work <br />of a quality comparable to the workmanship specified for other parts of the Work, <br />from firms having established good reputations for similar Work, or by following <br />industry standard practices. The Contractor shall perform all Work in compliance <br />with and conforming to applicable building codes in effect at the time the Work is <br />being performed. <br />1-05.18(3)E Safety <br />The Contractor alone shall be responsible for safety on the job site, including, but <br />not limited to, the safety of its and its Subcontractor's employees. The Contractor <br />shall maintain the Project site and perform the Work in a manner that meets the <br />City's responsibility under statutory and common law for the provision of a safe <br />place to work. <br />1-05.18(3)F Threats, Intimidation and Harassment Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ <br />employees, or any other agents to threaten bodily injury or property damage, to <br />intimidate or attempt to intimidate any person, or to assault or physically harass <br />any person. Forbidden conduct includes, but is not limited to, threatening, <br />appearing, or actually doing any of the following: pushing, shoving, striking, <br />physically blocking a person or a person’s vehicle, vandalism, malicious mischief, <br />or any other act that a reasonable person would understand be intended to <br />intimidate, cause personal injury, or cause property damage. Contractor shall <br />remove from the job site any person reasonably under its control or direction who <br />the Contractor or City reasonably believes violated this section. The lack of a <br />request from the City or City’s Representative to the Contractor to remove <br />someone from the job site does not relieve the Contractor from its obligation to <br />remove someone. <br />1-05.18(3)G Weapons Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ <br />employees, or any other agents or representatives to carry or possess, openly or <br />concealed, explosives or weapons on the job site, except: (a) such explosives are <br />as reasonably required for performance of the Work, such as those necessary for <br />blasting or demolition work called for by the Contract Documents or (b) <br />commissioned law enforcement officers or security personnel under authority of <br />their commission. A weapon is any object, instrument or chemical that is (1) <br />designed in such a manner to inflict harm or injury to another person; or (2) any <br />item used in a manner threatening harm or injury to another person. Weapons <br />include, but are not limited to, firearms, dangerous knives, dangerous chemicals, <br />tear gas, martial arts weapons, blackjacks or other weapons. Further, weapons <br />should include those described in EMC Chapter 10.78. Possession of mace, <br />pepper spray or the like for defensive purposes is not a violation of this policy. <br />Contractor shall remove from the job site any person reasonably under its control <br />or direction who the Contractor or City reasonably believes violated this section. <br />The lack of a request from the City or City’s Representative to the Contractor to