My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-80 <br />payable. If requested by the City, the Contractor shall promptly furnish proof of <br />payment of such accounts to the City. <br />1-05.18(3)D Attention to Work <br />The Contractor, either in person or acting through its representative, shall give <br />personal attention to and shall manage the Work so that it shall be prosecuted <br />faithfully and completed under the Project schedule. When its representative is not <br />personally present at the Project site, its designated alternate shall be available <br />and shall have the authority to act in matters relating to this Contract. <br />Where detailed construction requirements are not set forth in the Standard <br />Specifications or these Special Provisions, the Contractor shall perform the Work <br />of a quality comparable to the workmanship specified for other parts of the Work, <br />from firms having established good reputations for similar Work, or by following <br />industry standard practices. The Contractor shall perform all Work in compliance <br />with and conforming to applicable building codes in effect at the time the Work is <br />being performed. <br />1-05.18(3)E Safety <br />The Contractor alone shall be responsible for safety on the job site, including, but <br />not limited to, the safety of its and its Subcontractor's employees. The Contractor <br />shall maintain the Project site and perform the Work in a manner that meets the <br />City's responsibility under statutory and common law for the provision of a safe <br />place to work. <br />1-05.18(3)F Threats, Intimidation and Harassment Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ <br />employees, or any other agents to threaten bodily injury or property damage, to <br />intimidate or attempt to intimidate any person, or to assault or physically harass <br />any person. Forbidden conduct includes, but is not limited to, threatening, <br />appearing, or actually doing any of the following: pushing, shoving, striking, <br />physically blocking a person or a person’s vehicle, vandalism, malicious mischief, <br />or any other act that a reasonable person would understand be intended to <br />intimidate, cause personal injury, or cause property damage. Contractor shall <br />remove from the job site any person reasonably under its control or direction who <br />the Contractor or City reasonably believes violated this section. The lack of a <br />request from the City or City’s Representative to the Contractor to remove <br />someone from the job site does not relieve the Contractor from its obligation to <br />remove someone. <br />1-05.18(3)G Weapons Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ <br />employees, or any other agents or representatives to carry or possess, openly or <br />concealed, explosives or weapons on the job site, except: (a) such explosives are <br />as reasonably required for performance of the Work, such as those necessary for <br />blasting or demolition work called for by the Contract Documents or (b) <br />commissioned law enforcement officers or security personnel under authority of <br />their commission. A weapon is any object, instrument or chemical that is (1) <br />designed in such a manner to inflict harm or injury to another person; or (2) any <br />item used in a manner threatening harm or injury to another person. Weapons <br />include, but are not limited to, firearms, dangerous knives, dangerous chemicals, <br />tear gas, martial arts weapons, blackjacks or other weapons. Further, weapons <br />should include those described in EMC Chapter 10.78. Possession of mace, <br />pepper spray or the like for defensive purposes is not a violation of this policy. <br />Contractor shall remove from the job site any person reasonably under its control <br />or direction who the Contractor or City reasonably believes violated this section. <br />The lack of a request from the City or City’s Representative to the Contractor to
The URL can be used to link to this page
Your browser does not support the video tag.