My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
305 SE EVERETT MALL WAY SUBWAY 2025-09-24
>
Address Records
>
SE EVERETT MALL WAY
>
305
>
SUBWAY
>
305 SE EVERETT MALL WAY SUBWAY 2025-09-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 6:57:13 AM
Creation date
5/7/2024 9:03:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
305
Tenant Name
SUBWAY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Johnson J '/ ,�l <br /> �� Installation Scope of Work <br /> Controls <br /> The scope of work is a description of the project and services to be provided. It is a short narrative to include design brief, deliverables both products <br /> and services, and project objectives; Le., "what are we trying to accomplish for the customer?" <br /> Contact Information: <br /> Site Contact: <br /> Ester Parks <br /> esther@paadvisors.com <br /> Sales Contact: <br /> Michael Cunningham <br /> 253-246-9656 <br /> michael.allen.cunningham@jci.com <br /> System Operation: <br /> "'Important Information. The customer is to pay VIA check over the ACH in line "D". This message is trump the ACH payment, and the customer <br /> will be paying VIA Check <br /> This customer just purchased this space and needs to transfer the fire system over. <br /> The current Panel is a Honeywell Focus 200. With 37 point <br /> JCI to provide: <br /> Add Cellular communicator <br /> Add 2 batteries <br /> JCI to program panel to new ownership. <br /> JCI test and inspect the system. <br /> JCI to provide the annual inspection <br /> JCI to test signal to PNC. <br /> Programming Info: <br /> All programming will be through the panel and the phone lines. <br /> Site Conditions: <br /> Cement building. <br /> ceiling height is 10-20 feet high. <br /> Existing Equipment: <br /> JCI will use all existing equipment. <br /> Customer Expectations: <br /> JCI will be on site Monday thru Friday 7 am-5 pm Monday thru Friday. <br /> Page 4 of 5 03/14/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.