Laserfiche WebLink
Johnson J '/ ,�l <br /> �� Installation Scope of Work <br /> Controls <br /> The scope of work is a description of the project and services to be provided. It is a short narrative to include design brief, deliverables both products <br /> and services, and project objectives; Le., "what are we trying to accomplish for the customer?" <br /> Contact Information: <br /> Site Contact: <br /> Esther Park <br /> esther@paadvisors.com <br /> Sales Contact: <br /> Michael Cunningham <br /> 253-246-9656 <br /> michael.allen.cunningham@jci.com <br /> System Operation: <br /> "'Important Information. The customer is to pay VIA check over the ACH in line "D". This message is trump the ACH payment, and the customer <br /> will be paying VIA Check <br /> The customer just purchased this building and needs to take over the fire system. <br /> The current panel is an Ademco 5110 XM with 8 zones. <br /> JCI to provide: <br /> (1)TG-7 Radio. Located in the back of the building between Sportsman and Target. <br /> (1) Battery <br /> JCI to install all equipment on this order. <br /> JCI is to test panels and cells for proper function <br /> JCI to test signal to PNC. <br /> Programming Info: <br /> All programming is through the panel and the TG-7 radio. <br /> Site Conditions: <br /> Building type: Cement. <br /> The ceiling height is 10-20 feet high. <br /> Working conditions will be 10-12 feet high. <br /> No lift will be needed <br /> Existing Equipment: <br /> JCI will utilize all equipment. <br /> Customer Expectations: <br /> Page 4 of 5 03/14/2023 <br />