Laserfiche WebLink
A `. <br /> 40-003 BLDG.BILL OF MATERIALS SEQUENCE OF OPERATIONS LEGEND <br /> ITEM QTY. PART# ITEM DESCRIPTION <br /> 1 1 76-800100-001 ARIES NETLINK MULTI-LOOP CONTROL UNIT OUTPUT FUNCTIONS SEE SHEET EO FOR LEGEND AND ABBREVIATIONS. <br /> 2 1 76-800010-002 BACKPLANE PCB FOR ARIES NETLINK MULTI-LOOP CONTROL UNIT SYSTEM ADDITIONAL <br /> 3 1 76-800010-001 EXPANSION CARD CAGE FOR ARIES NETLINK MULTI-LOOP CONTROL UNIT <br /> 4 76-800015-001 ARIES NETLINK MULTI-LOOP OACT CARO. ANNUNCIATION& SYSTEM <br /> 5 5 KS-PS PHOTO DETECTOR TRANSMISSION ACTIONS <br /> 6 5 OS-SB STANDARD BASE FOR OS SERIES DETECTORS. <br /> 7 1 64-330002-001 PULL STATION-ADDRESSABLE ?h 1 <br /> 8 36 70-610001-001 Al MONITOR MODULE N/O-N/C <br /> CONSTRUCTION9 2 <br /> NOTES l <br /> SLA1146 12V 26AH BATTERIES4? <br /> 10 O O06-SS000689-1 RECORD STORAGE CABINET OO 1. L LAN WORK <br /> MED. <br /> 11 1 1000015 SSU-00500 - BATTERY CABINET 1z' <br /> 12 7 04120 SYSTEM SENSOR DUCT DETECTOR A4/ ' =CO <br /> Cv <br /> Zt4 4114 <br /> 40.003 BUILDING SYSTEM FACP POINTS LIST 4FQ� � <br /> Q <br /> POINT ADDRESS/ZONE BOEING DESCRIPTION FACP POINTS DESCRIPTION SHEET I GRID LOC. <br /> _1:001/122 8V3-1 TAMPER WALL PIV SPRINKLER VALVE 1E265 / A/2.5 4u 44U h <br /> _1:002/123 SV3-1 WF PRESSURE WATERFLOW PRESSURE SWITCH 1E265 / A/2.5 <br /> _1:003/124 SV3-1 HI/LO AIR HI/LO AIR PRESSURE SWITCH 1E265 / A/2.5AQ <br /> _1:004/125 SV3-2 TAMPER WALL PIV SPRINKLER VALVE 1E260 / E/3 Q 0 <br /> _1:005/126 SV3-2 WF PRESSURE WATERFLOW PRESSURE SWITCH 1E260 / E/3 O D <br /> _1006/127 SV3-2 HI/LO AIR HI/LO AIR PRESSURE SWITCH1E260 / E/3 v <C� <br /> L1007/12B SV3-3 TAMPER WALL PIV SPRINKLER VALVE 1E265 / A/2.5 <CI= <br /> _1:008/129 SV3-3 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY 1E265 / A/2.5 O O Q O Q <br /> _1:009/12F SV3-3 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH 1E265 / A/2.5 <br /> INPUT CONDITION �� Q h�CO <br /> _1:010/12B SV3-4 TAMPER WALL PIV SPRINKLER VALVE 1E260 / E/3 STANDBY CONDITION(NORMAL) • <br /> L1:011/12C SV3-4 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY 1E260 / E/3 AC POWER FAILURE • • <br /> LI:0121120 SV3-4 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH 1E260 / E/3 <br /> u:013/12E SV3-5 TAMPER WALL PIV SPRINKLER VALVE 1E267 / A/10.5 w ANY CIRCUIT-OPEN,SHORT,GROUNDDO <br /> ! ! <br /> 11:014/130 SV3-5 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY 1E267 / A/10.5 SLC DEVICE MISSING • • <br /> m <br /> _1:015/131 SV3-5 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH IE267 / A/10.5Q COMM.FAULT/AES TROUBLE • • <br /> _1:016/132 SV3-6 TAMPER OS&Y SPRINKLER VALVE 1E262 / E/9 0 <br /> BATTERY FAULT-LOW/HIGH VOLTAGE • • Kidde 400 Main Street <br /> 11:017/133 SV3-6 WF PRESSURE WATERFLOW PRESSURE SWITCH 1E262 / E/9 <br /> _1:018/134 SV3-6 HI/LO AIR HI/LO AIR PRESSURE SWITCH 1E262 / E/9 Fire Systems Ashland.M01721 <br /> u:019/135 SV3-7 TAMPER OS&Y SPRINKLER VALVE 1E267 / A/10.5 HEAT DETECTOR ELEV 30 MACH RM • • • Y Phone:(50B)881-2000 <br /> L1:020/136 SV3-7 WF PRESSURE WATERFLOW PRESSURE SWITCH 1E267 / A/10.5 10 HEAT DETECTOR ELEV 30 SHAFT • • • wvr✓1.k ddefi esystems.cc <br /> 11:021/137 SV3-7 HI/LO AIR HI/LO AIR PRESSURE SWITCH 1E267 / A/10.5 'o: Aries NETLink Power and Battery Calculation <br /> L1022/13e SV3-8 TAMPER WALL PIV SPRINKLER VALVE 1E262 / E/9 d SPRINKLER TAMPER SWITCH • • 2.2,'171 <br /> 11:023/139 SV3-8 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY 1E262 / E/9 Enter Distributor information:ALEXANDER GOW FIRE BQUIPMENT COMPANY <br /> L1024/13F SV3-8 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH 1E262 / E/9 MANUAL STATION 40-003 BLDG • • Name:KEVIN MULLEN <br /> L1025/13B SV3-9 TAMPER WALL PIV SPRINKLER VALVE 1E269 / A/15 SMOKE DETECTION 40-003 BLDG • • Project Name:BOEING EVERETT 40-03 BLDG FIRE ALARM REPLACEMENT <br /> L1Service Request r..026/13C SV3-9 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY 1E269 / A/15 gSPRINKLER FLOW SWITCH • • Prepared By:KEVIN MULLEN <br /> 11:027/130 SV3-9 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH 1E269 / A/15 <br /> Q SMOKE DETECTION ELEV 30 1ST FLOOR • • • oesc prion <br /> L1028/13E SV3-10 TAMPER WALL PIV SPRINKLER VALVE 1E263 / E/13.5 - --- <br /> L1029/140 SV3-10 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY 1E263 / E/13.5 � SMOKE DETECTION ELEV 30 2ND FLOOR • • • <br /> _1:030/141 SV3-10 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH 1E263 / E/13.5 DO SMOKE DETECTION ELEV 30 MACH RM • • • <br /> _1:031/142 UV3-BA TAMPER BUTTERFLY SPRINKLER VALVE 1E262 / E/10 SMOKE DETECTION ELEV 30 SHAFT • • • <br /> LI032/143 UV3-BB TAMPER BUTTERFLY SPRINKLER VALVE 2E262 / E/10 Power Supply and BatiBry Size Calculation <br /> _1:033/144 UV3-10A TAMPER OS&Y SPRINKLER VALVE 1E263 / E/13.5 ACnter <br /> alai Stand-By Current per System: 0.345 Amps <br /> 11:034/145 UV3-1OA HI/LO AIR HI/LO AIR PRESSURE SWITCH 1E265 / E/13.5 otal Alam Current per System: 0.940 <br /> Amps <br /> L1035/146 DO HVAC-1 SUPPLY SUPERVISORY 2E262 / D/8.5 Stand-By Hours: 46 ur <br /> 11:036/147 DO HVAC-1 RETURN SUPERVISORY 2E262 / 0.2/8.5 nlerAlarm Time: 10 nice <br /> L1037/14e DO AC-2 SUPERVISORY 2E262 / 0/7.2 mpere Hour Required((A'Cµ(B'D)): 16.73 AH <br /> dalAmp Hour Require(Derating Factor 12): 21.00 FiigM-Click to Update.Print and <br /> L103B/149 OO HVAC-2 SUPPLY SUPERVISORY 2E2620.2/7.7 atiery3lDe RCquted per System(two(2)batteries required): Clear Battery Calculation. <br /> LI:039/14F 00 HVAC-2 RETURN SUPERVISORY 2E262 / 0.8/7.7 N -Tiered Main or Expansion Enclosure,Max.15 Amps' 1 <br /> _1:040/14B SMK ELEV 30 LEY LVL 1 ELEV. 30 LOBBY SMOKE DET. LEVEL 1 1E262 / E/10 1 Expansion Enclosure(s)Required? YE <br /> _1 041/14C SMK ELEV 30 LEY LVL 2 ELEV. 30 LOBBY SMOKE DET. LEVEL 2 2E262 / E/SO J Number of Enclosure(Main/Expansion)Required: 1 <br /> L1042/14D SMK ELEV 30 SHAFT ELEV. 30 SHAFT SMOKE DET. 2E262 / E/SO K Number of Power Management Unit(PMU)Board Required: 1 <br /> L1043/14E HEAT ELEV 30 SHAFT SUPERVISORY - FOR ELEVATOR SHUNT 2E262 / E/10 L Number of Power Supply Unit(PSU)Required: 1 <br /> _1:044/150 SMK ELEV 30 MACH RM IFLFV. 30 MACHINE ROOM SMOKE nET. 12E262 / n.5/10.5 <br /> Copy BOM Search <br /> _1:045/151 HEAT ELEV 30 MACH RM SUPERVISORY - FOR ELEVATOR SHUNT 2E262 / 0.5/10.5 <br /> _1:046/152 MAN PULL @ FACP PULL STATION @ FIRE ALARM PANEL 2E262 / D.5/10.5 Total Total <br /> Unit Un it Un it U nit <br /> L1047/153 SMK @ FACP SMOKE DETECTOR @ FIRE ALARM PANEL 12E262 / D.5/10.5 Stand by Standby Alarm Alarm <br /> L1048/154 CELL RAILER FAIL CELLULAR COMMUNICATOR PANEL TROUBLE 2E262 / D.5/10.5 Item Enter Current Current Current Current <br /> oescription Quantity (Amps) (Amps) (Amps) (Amps) <br /> 1 MCB(wth Keyboard/Display) 1 0.1581 0.156 0.300 0.30 <br /> 2 elay Expansion Card 1 0.012 0.012 0.080 0.08 <br /> 3 igital Alarm Communicator Transmitter(DACT)Expansion Card(Max.1 Per System) 1 0.024 0.024 0.037 0.03 <br /> 4 SmartOne Photoelectric Smoke Detector DS-PS 5 0.000150 0.000750 0.0001220 0.00110 <br /> 5 SmartOne Contact Input Module(Ad's,NO) 36 0.000580 0.020880 0.000580 0.02088CI <br /> 6 HS Series Exceder Hom/Stobes 1 0.000 0.000 0.163 0.16 <br /> 1 <br /> 1 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN AIL SUBTITLE CURRENT REVISION I SYMBOL DATE <br /> A SHOP DRAWINGS 30397493 AGOW JS 09.19.23 SP <br /> THIS DESIGN AND/OR CHECKED <br /> FIRE ALARM SYSTEM DETAILS 30397493 A 09.19.23 <br /> ECIFICATION IS APPROVED <br /> Q�BOE//VG m SHEET SEQUENCE N0. <br /> APPROVED BY DEPT. DATE N IN TITLEEVERETT FIRE PANEL REPLACEMENT E506�� <br /> CHECKED <br /> ° L APPROVED BUILDING 40-003 <br /> APPROVED ELECTRICAL EVERETT, WA. DWG No. 40-003-E506-2 <br />