My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 1 Scope of Services <br />EXHIBIT A <br />SCOPE OF SERVICES <br />Background <br />Lexington-Broadway Stormwater Improvements preliminary design was completed in August <br />2023. Final design and construction will be completed in phases to allow for offline construction <br />of the treatment facilities, to mitigate construction impacts to the community, and to proportion <br />construction costs and plan budget expenditures. Project phasing is summarized below: <br />1. Phase 1 work includes stormwater conveyance piping in Lenora Street, pretreatment <br />structures in Zillah Street, and a regional stormwater treatment facility on property at the <br />Lenora Street/Zillah Street intersection. Refer to Figure 1 for the Phase 1 design limits. <br />2. Future Phase 2 work includes stormwater conveyance piping in Lenora Street beneath the <br />Burlington Northern Santa Fe (BNSF) railroad crossing and construction of a new <br />stormwater outfall to the Snohomish River, located within Riverfront Park. <br />3. Future Phase 3 and Phase 4 work includes the stormwater conveyance and collection <br />system in 3rd Avenue, Lowell Road, 52nd Street, Broadway, Commercial Avenue, and <br />Lexington Avenue. <br /> <br /> <br />Figure 1. Lexington-Broadway Stormwater Improvements Phase 1 location
The URL can be used to link to this page
Your browser does not support the video tag.