My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXPENSESCity of Everett: Lexington‐Broadway SW Improvements Phase 1Mileage/mile (2023) Meals/dayCopies/Page 11x17 ColorCopies/Page 11x17 B&WCopies/Page 8.5x11 B&WCopies/Page 8.5x11 ColorBond Plots - B&W (per sq. ft.)TravelTravelOffice Expenses Office Expenses Office Expenses Office Expenses Office ExpensesOTHER DIRECT COSTSEachEachEachEachEachEachEachUnit Cost$0.670$71.000$0.900$0.090$0.050$0.450$0.1405.00%200Quantity0000000Task Total$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.003001000Quantity 400600000Task Total$268.00$426.00$0.00$0.00$0.00$0.00$0.00$694.00 $34.70$728.70Total ODC348.40$ 568.00$ 90.00$ 45.00$ -$ -$ 28.00$ 1,079.40$ 53.97$ 1,133.37$ Total ODCODC MarkupTotal ODC + MarkupPermitting Survey and Utility LocationGeotechnicalC:\CKinzer\01 Project\10356686 Lexington SW\00_Phase 1 Scoping\City Meetings\2024‐03‐29 Erik_Heather\Everett ‐ Lex‐Broadway SW Imp Ph1 Estimate_Final_2024.03.29.xlsm
The URL can be used to link to this page
Your browser does not support the video tag.