My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
FEE ESTIMATE <br />City of Everett: Lexington-Broadway SW Improvements Phase 1 <br />Task # Task Description <br />Total <br />Labor <br />Total <br />Expenses <br />Total <br />Subconsultants <br />Total For <br />Proposal <br />100 Project Management $80,389 $0 $0 $80,390 <br />200 Survey and Utility Location $3,090 $0 $14,490 $17,580 <br />300 Geotechnical $5,145 $0 $66,584 $71,730 <br />400 Cultural Resource Services $8,866 $0 $0 $8,870 <br />500 Project Reports $22,574 $0 $0 $22,570 <br />600 Design and Engineering Services $468,708 $300 $0 $469,010 <br />700 Final Design Services $122,173 $105 $0 $122,280 <br />800 Bid Phase Support - Not Included $0 $0 $0 $0 <br />900 Design Support During Construction - Not Included $0 $0 $0 $0 <br />1000 Permitting $84,299 $729 $0 $85,030 <br />$795,244 $1,134 $81,074 $877,460 <br />C:\CKinzer\01 Project\10356686 Lexington SW\00_Phase 1 Scoping\City Meetings\2024‐03‐29 Erik_Heather\Everett ‐ Lex‐Broadway SW Imp Ph1 Estimate_Final_2024.03.29.xlsmPage 4
The URL can be used to link to this page
Your browser does not support the video tag.