My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
HDR-Lexington-Broadway Stormwater Imp- <br />PhaseI-PSA-EE-SD <br />Final Audit Report 2024-05-06 <br />Created:2024-05-03 <br />By:Marista Jorve (mjorve@everettwa.gov) <br />Status:Signed <br />Transaction ID:CBJCHBCAABAAZy-rjWey5wmQzrtBz4O0pkOZ_8hME2Aq <br />"HDR-Lexington-Broadway Stormwater Imp-PhaseI-PSA-EE-SD <br />" History <br />Document created by Marista Jorve (mjorve@everettwa.gov) <br />2024-05-03 - 6:34:37 PM GMT <br />Document emailed to eemerson@everettwa.gov for approval <br />2024-05-03 - 6:35:13 PM GMT <br />Email viewed by eemerson@everettwa.gov <br />2024-05-06 - 3:43:10 PM GMT <br />Signer eemerson@everettwa.gov entered name at signing as Erik Emerson <br />2024-05-06 - 3:46:14 PM GMT <br />Document approved by Erik Emerson (eemerson@everettwa.gov) <br />Approval Date: 2024-05-06 - 3:46:16 PM GMT - Time Source: server <br />Document emailed to Rob Berman (rob.berman@hdrinc.com) for signature <br />2024-05-06 - 3:46:18 PM GMT <br />Email viewed by Rob Berman (rob.berman@hdrinc.com) <br />2024-05-06 - 6:41:56 PM GMT <br />Document e-signed by Rob Berman (rob.berman@hdrinc.com) <br />Signature Date: 2024-05-06 - 11:07:47 PM GMT - Time Source: server <br />Document emailed to Tim Benedict (TBenedict@everettwa.gov) for approval <br />2024-05-06 - 11:07:49 PM GMT <br />Email viewed by Tim Benedict (TBenedict@everettwa.gov) <br />2024-05-06 - 11:14:22 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.