Laserfiche WebLink
IF <br /> PIPING GENERAL NOTES-2018 WSEC HVAC GENERAL NOTES-2018 WSEC <br /> L <br /> -ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATINGOF50ORLESS. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED.THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER U) <br /> -ELASTOMERIC INSULATIONS SHALL BE CLOSED CELL. TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. O 3.E <br /> y -ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. 2. MATERIALS,METHODS,AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2018 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE,INTERNATIONAL BUILDING <br /> 3 -PROVIDE REMOVABLE LACED INSULATION PAD OVERALL CONTROL VALVES,WHERE NOT LOCATED WITHIN A MECHANICAL ROOM. CODE,INTERNATIONAL FIRE CODE 2018 WSEC,AND LOCAL CODES AND ORDINANCES. m E <br /> $ -PROVIDE ALUMINUM JACKET ON ALL INSULATED PIPING OUTSIDE BUILDING. 3. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2018 IBC. J rn <br /> 8 -AT PIPE HANGERS PROVIDE RIGID INSULATION BETWEEN PIPE AND HANGER. O a <br /> 4. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF o <br /> THE FLOOR OR WALL. <br /> 1.THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAYBE REQUIRED.THE MECHANICAL CONTRACTOR IS TO COORDINATE WITH ALL 5. HVAC EQUIPMENT AND VALVES SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS.UNLESS SHOWN ON ARCHITECTURAL DRAWINGS,REQUIRED ACCESS PANELS SHALL BE 0 v <br /> OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR.MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18"X 18'. J r <br /> 8 C) m N <br /> 2.MATERIALS,METHODS,AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2018 INTERNATIONAL BUILDING CODE(IBC),INTERNATIONAL MECHANICAL CODE(IMC), 6. HEAT TRACING OF PIPING,WHERE INDICATED,SHALL BE PROVIDED AND INSTALLED BY THE HVAC CONTRACTOR.THE HVAC CONTRACTOR IS TO COORDINATE THE HEAT TRACE 0 o <br /> INTERNATIONAL ENERGY CODE(IEC)AND UNIFORM PLUMBING CODE(UPC)AS AMENDED BY THE STATE OF WASHINGTON AND LOCAL AUTHORITIES. POWER WIRING WITH ELECTRICAL CONTRACTOR. ¢CUo <br /> s 7. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE,RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER.RECORD DRAWINGS C LL <br /> 3.SLOPE ALL INDIRECT DRAINS AT 2%UNLESS OTHERWISE NOTED ON DRAWINGS.OBTAIN APPROVAL FROM THE CODE AUTHORITY BEFORE INSTALLING PIPING AT LESS THAN 2% SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT,GENERAL CONFIGURATION OF DUCTAND PIPE DISTRIBUTION SYSTEM, C ^a <br /> �5 (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). INCLUDING SIZES,AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. <br /> 7 8. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE:SUBMITTAL DATA,NAMES AND ADDRESSES OF AT LEAST ONE SERVICE <br /> m 4.HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH THE 2018 IMC AND IBC AS AMENDED BY THE STATE OF WASHINGTON AND LOCAL AUTHORITIES. AGENCY,HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. <br /> R• <br /> $ 5.PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF 9. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER J�J <br /> THE FLOOR OR WALL. <br /> W <br /> 10. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL BE LISTED AND LABELED AS HAVING A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A F _� <br /> 6.PROVIDE SHUT-OFF VALVES AT ALL EQUIPMENT CONNECTIONS. SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723,EXCEPT AS NOTED IN SECTION 602.2.1 OF THE 2018 IMC. - <br /> 11. ALL MECHANICAL WORK SHOWN ON DRAWINGS INTENDED TO BE INSTALLED SOLELY BY MACDONALD-MILLER FACILITY SOLUTIONS.MACDONALD-MILLER FACILITY SOLUTIONS <br /> 7.PROVIDE UNION,GROOVED OR FLANGED CONNECTION AT EQUIPMENT FOR FUTURE REMOVAL AND SERVICING. SHALL NOT BE HELD ACCOUNTABLE FOR ANY DESIGN OR CONSTRUCTION DEFICIENCIES IF WORK IS PERFORMED BY AN OUTSIDE PARTY. s°BtoX ®e <br /> 8.PROVIDE MINIMUM V AIR BREAK FOR ALL CONDENSATE PIPE TERMINATIONS AT DRAINS. <br /> 9.PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. <br /> 10.HEAT TRACING OF PIPING,WHERE INDICATED,SHALL BE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR.COORDINATE ELECTRICAL SUPPLY FOR HEAT TRACE <br /> CONTACT LIST 08/16/2023 <br /> WITH ELECTRICAL CONTRACTOR. TITLE NAME COMPANY PHONE NUMBER EMAIL <br /> ENGINEERING MANAGER-HC CHRIS LEE MACDONALD MILLER 206.768-4266 CHRIS.LEE@MACMILLER.COM I <br /> SENIOR PROJECT EXECUTIVE ROB PAINTER MACDONALD MILLER 206-768-4122 ROB.PAINTER@MACMILLER.COM F <br /> ASSOCIATE ACCOUNT EXECUTIVE TRISTAN MILES MACDONALD MILLER 206-768-3868 TRISTAN.MILES@MACMILLER.COM <br /> SHEETMETAL SUPERINTENDENT TIM FELTON MACDONALD MILLER 206-396-9641 TIM.FELTON@MACMILLER.COM <br /> CONTROLS SPECIALIST SUPERVISOR ADAM KLETT MACDONALD MILLER 206-768-4174 ADAM.KLErT@MACMILLER.COM <br /> PIPING MATERIAL SCHEDULE ELECTRICAL SUPERINTENDENT GREG SUKRAW MACDONALD MILLER 206.571-3055 GREG.SUKRAW@MACMILLER.COM <br /> ELECTRICAL SUPERINTENDENT CLAYTON PARKER MACDONALD MILLER 206.768.4234 CIAYTON.PARKER@MACMILLER.COM <br /> PIPING SIZE MATERIAL JOINT <br /> COPPER TYPE LEAD FREE SOLDER RONICA DAVENPORT ALTASCIENCES 425422-2405 RDAVENPORT@ALTASCIENCES,COM <br /> STEAM(100 LBS&LESS) 12'-4" <br /> SCH 10 304 STAINLESS STEEL WELDED <br /> STEAM CONDENSATE DRAIN 12"-2-12" COPPER TYPE LEAD FREE SOLDER,PRESSED MECH JOINT <br /> HUMIDIFIER WATER SUPPLY 12"-2-1/2" COPPER TYPEL LEAD FREE SOLDER,PRESSED MECH JOINT <br /> HUMIDIFIER WATER DRAIN 12"-2-112" COPPER TYPE <br /> LEAD FREE SOLDER,PRESSED MECH JOINT Z <br /> 12'-2" SCH 40 BLK STL,ASTM A53 A OR B THREADED,FLANGED,SOCKET WELDED SCOPE OF WORK g <br /> NATURAL GAS GG <br /> LU <br /> 2-12'-4^ SCH 40 BLK STL,ASTM A53 A OR B BUTT WELDED,FLANGED REPLACE(8)ROOF MOUNTED HUMIDIFIERS IN THE SAME LOCATIONS.DISCONNECT AND RECONNECT EXISTING STEAM SUPPLY PIPING,NATURAL GAS,WATER SUPPLY,AND DRAIN. I I <br /> I I NI m <br /> a <br /> 0 <br /> PIPING INSULATION SCHEDULE <br /> PIPING PIPE INSULATION INSULATION CONDUCTIVITY DRAWING SHEET INDEX - HVAC <br /> TYPE SIZE TYPE THICKNESS RANGE <br /> STEAM(201%250'F) 12'-3' FIBERGLASS 2-12' 0.27-0.30 NUMBER TITLE <br /> (0-15 LBS) 4^� FIBERGLASS 3" 0.27-0.30 TM0.01 SCHEDULES <br /> STEAM CONDENSATE DRAIN PIPING 12-1-1/4" FIBERGLASS,ELASTOMERIC FOAM 12" 0.21-0.27z <br /> SITE PLAN O <br /> 1-10+ FIBERGLASS,ELASTOMERIC FOAM 1' 0.21-0.27 TM0.02 SCHEDULES N <br /> HUMIDIFIER WATER SUPPLY(INDOORS) 12"-1-1/4" NONE N/A N/A TM2,04E ROOF PARTIAL PLAN-EAST W <br /> HUMIDIFIER WATER SUPPLY(OUTDOORS) 12"-1-1/4^ FIBERGLASS,ELASTOMERIC FOAM ill" 0.21-0.27 TM3.01 ELEVATIONS <br /> F <br /> HUMIDIFIER WATER DRAIN(INDOORS) 12"-1-114" NONE N/A N/A 1 TM3.02 AERIAL VIEW Z <br /> HUMIDIFIER WATER DRAIN(OUTDOORS) 112"-1-114" FIBERGLASS,ELASTOMERIC FOAM 1/2" 0.21-0.27 TM6.01 DETAILSISN N <br /> NATURAL GAS ALL NONE N/A N/A a > <br /> la x <br /> J <br /> LEGAL DESCRIPTION <br /> HUMIDIFIER SCHEDULE PARCEL NUMBER:28040200301000 U.1 <br /> UNIT NO. EQUIP STEAM DISTRIBUTION GAS INPUT ELECTRICAL OP WEIGHT PROPERTY DESCRIPTION:SEC 02 TWP 28 RGE 04LOT 5B OF SEAWAY CENTER FOUR BSP REC VOL I OF SSP'S PG 246-247 AF NO 9203025002 BEING PTN OF SWI/4 I� <br /> SERVED MFR.&MODEL NO. TYPE LBSIHR PRESS I CFM TUBES BTUIH VOLTIPH FMCA (LBS) NOTES AI <br /> HUM-1.1 MUA-1 NORTEC GSTC-500 OUTDOOR GAS 500 71NWC 26,670 DUCT MOUNTED 700,000 120/1 1 21.0 1505 DEMO LL <br /> HUM-1.2 MUA-1 NORTEC GSTC400OUTDOOR GAS 400 71WC 26,670 DUCT MOUNTED 560,000 120/1 1 15.2 1210 DEMO I1J <br /> HUM-2.1 MUA-2 NORTEC GSTC-500 OUTDOOR GAS 500 71NWC 25,790 DUCT MOUNTED 700,000 120/1 21.0 1505 DEMO <br /> HUM-2.2 MUA-2 NORTEC GSTC400 OUTDOOR GAS 400 71NWC 25,790 DUCT MOUNTED 560,000 120/1 15.0 1210 DEMO ILL_ <br /> HUM-4.1 MUA4 NORTEC GSTC-500 OUTDOOR GAS 500 71NWC 27,200 DUCT MOUNTED 700,000 120/1 21.0 1505 DEMO Q <br /> HUM-4.2 MUA4 NORTEC GSTC400 OUTDOOR GAS 400 71NWC 27,200 DUCT MOUNTED 560,000 120/1 15.2 1210 DEMO <br /> HUM-5.1 MUA-5 NORTEC GSTC-500 OUTDOOR GAS 500 71NWC 27,200 DUCT MOUNTED 700,000 120/1 21.0 1505 DEMO C <br /> HUM-5.2 MUA-5 NORTEC GSTC400 OUTDOOR GAS 400 71NWC 27,200 DUCT MOUNTED 560,000 120/1 15.2 1210 DEMO HUM-1.1 MUA-1 CONDAIR GSTC-500 OUTDOOR GAS 500 7 INWC 26,670 DUCT MOUNTED 700.000 12011 21.0 L <br /> ESQ <br /> 0 <br /> HUM-1.2 MUA-1 CONDAIRGSTC-400 OUTDOOR GAS 400 71 WC 26,670 DUCT MOUNTED 560,000 120/1 15.2 1210 NEW,1-5 W <br /> HUM-2.1 MUA-2 CONDAIR GSTC-500 OUTDOOR GAS 500 71NWC 25,790 DUCT MOUNTED 700,000 120/1 21.0 1505 NEW,1-5 I f 1 <br /> HUM-2.2 MUA-2 CONDAIR GSTC-400 OUTDOOR GAS 400 71NWC 25,790 DUCT MOUNTED 560,000 120/1 15.0 1210 NEW,15 Y V <br /> HUM-4.1 MUA-0 CONDAIRGSTC5000UTDOOR GAS 500 71NWC 27,200 DUCT MOUNTED 700,000 120/1 21.0 1505 NEW, Pa U Z} <br /> HUM-4.2 MUA-0 CONDAIRGS1242OUTDOOR GAS 400 71NWC 27,200 DUCT MOUNTED 560,000 120/1 15.2 1210 NEW,1-5 TON LU Q <br /> HUM-5.1 MUA-5 CONDAIR GSTCSOOOUTDOOR GAS 500 71NWC 27,200 DUCT MOUNTED 700,000 120/1 21.0 1505 NEW,15 SITE DZ <br /> HUM-5.2 MUA-5 CONDAIR GSTC-400 OUTDOOR GAS 1 400 1 71NWC 27,200 DUCT MOUNTED 560,000 120/1 1 15.2 1 1210 1 NEW,1-5 Ap U D_ <br /> 0U5a <br /> 1.NOTES:OWER WIRING AND DISCONNECT SWITCH BY THE ELECTRICAL CONTRACTOR. N�ty /' Q Y W <br /> 2.CONFIGURATION AND INCLUDED FACTORY OPTIONS: 7A I..L W O J U LLI <br /> -FOR USE WITH DOMESTIC POTABLE,RO,AND DI WATER O J U GG Un <br /> -CONNECTIONS:4"STEAM OUTLET,1-1/4"GAS,1/2"SUPPLY WATER,314"DRAIN WATER `� �/ <br /> -NATURAL GAS PRESSURE:4.5 TO 91NWC 1 J <br /> -ENCLOSED WEATHERPROOF INTEGRAL CABINET,INTEGRATED COOLING FANS AND FREEZE PROTECTION J J I1J <br /> -FACTORY CONTROLS WITH MODBUS AND BACNET <br /> LU <br /> -INTERNALDRAINER TEMPERING TO140'FDISCHARGE VICINITY MAP Z Z in co 2 LU <br /> LU V w <br /> -BACNET CAPABILITY N <br /> 3.INTEGRATION WITH EXISTING SENSORS AND THE BMS BY THE CONTROLS CONTRACTOR. NO SCALE (/�r/�O (/'J ^ <br /> 4.STEAM INLET ADAPTER,ONE ADAPTER PROVIDED FOR EACH PAIR OF HUMIDIFIERS(TOTAL QTY 4).ADAPTERS PROVIDED WITH HUMIDIFIERS. "' "' 111 "' LL <br /> (2)4'STEAM INLET CONNECTIONS,3/4"DRAIN. <br /> ENGINEER -REVISED <br /> 5.PROVIDE 4'MANUAL STAINLESS STEEL GATE VALVES AT STEAM LINE CONNECTIONS TO EACH STEAM INLET ADAPTER.VALVES BY M-M. <br /> C LEE 08-16-23 <br /> CHECKED <br /> Permit#: M2308-028 SHARGROVE 08-16-23 <br /> Site Address: 6605 Merrill Creek Parkway BAD <br /> Owner: SNBL USA LTD D LAMBERT 08-08-23 <br /> Additional Permits Are Required Application Date: 08/11/2023 <br /> DR-ING NUMBER <br /> For This Project To Include: Description: REPLACE 8 HUMIDIFIERS C-2710-73234418-00 <br /> Review Status: APPROVED SHEET NUMBER <br /> E] Plumbing Review Date: 09/12/2023 <br /> Sprinkler T M 0.01 <br /> ❑ Mechanical ❑ <br /> Fire Alarm L City of Everett Permit Review <br /> s © Electrical EVERETT Status:Approved <br /> ....,..... 09/12/2023 8:58:55 AM <br />