My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/05/08 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/05/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 11:15:56 AM
Creation date
5/9/2024 8:30:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/8/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Award Construction Contract for the Water Main Replacement “Y”, Phase 1 project to <br />Earthworks Solutions <br />Council Bill # interoffice use <br /> <br />Project: Water Main Replacement “Y”, Phase 1 <br />Partner/Supplier: NA <br /> Location: Multiple locations within the Water Service Area <br />Preceding action: Plans and Systems Ordinance 3928-23, 1/27/23, Call for bids 3/6 <br />Fund: Fund 336 – Water & Sewer System Improvements Fund <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 5/8/24 <br />Action <br />Ordinance <br />Public hearing <br /> Yes x No <br /> <br />Budget amendment: <br /> Yes x No <br /> <br />PowerPoint presentation: <br /> Yes x No <br /> <br />Attachments: <br />Bid results <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Souheil Nasr <br /> <br />Phone number: <br />425.257.7210 <br /> <br />Email: <br />snasr@everettwa.gov <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />Funding source for this project will be Fund 401 Water and Sewer Utility fund. The <br />programmed available funding for design and construction is $3,750,000. <br />Project summary statement: <br />This project will install new water main to replace existing water mains that have a high <br />consequence of failure, and/or recently prone to breaks. The upgrade of these water <br />mains will ensure reliability of water service for existing customers and future <br />development, and that adequate fire flow, per the 2020 Comprehensive Water Plan, is <br />provided. <br />Bid opening for the Water Main Replacement “Y”, Phase 1 project was held on April 2, <br />2024. Two bids were received. The lowest responsive and responsible bidder was <br />Earthworks Solutions with a bid of $3,300,935.68. The Engineer’s estimate was <br />$3,122,967.86. City staff recommends awarding the construction contract to Earthworks <br />Solutions. <br />Recommendation (exact action requested of Council): <br />Award the construction contract for the Water Main Replacement “Y”, Phase 1 project to <br />Earthworks Solutions in the amount of $3,300,935.68. <br />
The URL can be used to link to this page
Your browser does not support the video tag.