Laserfiche WebLink
12/15/23,9:56 AM waenergycodes.com/print_project_summary_form.php?k=aWQ9Mjl2OTYmZnZpPTE3JmN0aT00Ng==&print=1 <br /> MECHANICAL COMPLIANCE SUMMARY <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Administered by:©2023 NEEA,All rights reserved <br /> Project Title POWDERMILL BUILDING B SPEC.T.I.-2018 WSEC For Building Department Use: I Date: Dec 15,2023 <br /> Project Address 6305 36TH AVE.W. <br /> Project&Applicant Everett,WA 98203 <br /> Information Applicant Name AIDAN WILSON <br /> Applicant Phone 253-939-5501 <br /> Applicant Email DESIGN@UNIVERSALREFRIG.COM <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Office,Other Building Cond.Floor Area 3,355 <br /> New Building Alteration Project Cond.Floor Area 3,355 <br /> General Project Types Tenant Spaces—Fust Build Out or Addition Mechanical Scope Single Zone Systems&Equipment Floors Above Grade 1 <br /> Mechanical Scope Compliance Method Compliance Method I-General <br /> Mechanical Project INSTALL(3)ENERGY RECOVERY VENTILATORS,INSTALL(1)PACKAGE ROOFTOP UNIT,INSTALL(5)EXHAUST FANS W/ASSOC.VENTING,INSTALL DUCTWORK,GRILLES&REGISTERS, <br /> Description INSTALL NATURAL GAS PIPING. <br /> Economizer Equipment Efficiency <br /> DORS Ventilation Higher Equipment <br /> Mechanical Project Type Mechanical Scope Exception(s) Compliance <br /> Compliance Applied? Provided? Efficiency Option Applied? Verification <br /> Scope and Method Tenant Spaces—First Build Out Single Zone Systems& Yes Yes NA COMPLIES <br /> Equipment <br /> Additional Efficiency <br /> Credits Included <br /> (AEC) <br /> Does building include <br /> occupancy <br /> classifications Yes Does project include DOAS equipment? Yes <br /> requiring DOAS? <br /> Based on project scope <br /> do TSPR requirements No Do all systems comply with Appendix D standard reference design or qualify for an exception to TSPR? No <br /> apply? <br /> Scope&Space Conditioning TENANT SPACES—FIRST BUILD OUT-SINGLE ZONE SYSTEMS&EQUIPMENT Compliance Verification COMPLIES <br /> Single Zone Air Systems Category-Dedicated outside air system(DOAS) <br /> Air Systems Summary Information <br /> Ventilation Airflow Energy Recovery <br /> System/Equip ID Paired with other Systems/Equip Control Ventilation Standard Ventilation CFM Ventilation energy recovery Efficiency(%) <br /> ERV-1 Constant volume IMC Ventilation 150 Yes per C403.3.5.1 DOAS ER 79 <br /> ERV-3 Constant volume IMC Ventilation 150 Yes per C403.3.5.1 DOAS ER 79 <br /> ERV-2 Constant volume IMC Ventilation 150 Yes per C403.3.5.1 DOAS ER 79 <br /> Air Systems&Equipment-Heating <br /> System AEC Proposed Heat Proposed Low Efficiency <br /> /Equip Heating System/Equip Specific Type Heat Pump Heating Capacity Cooling Capacity Efficiency Pump HPH OSA LTH Compliance <br /> ID ape (Btu/h) (Btu/h) Multiplier Heating Efficiency Units Temp Efficiency Units Verification <br /> ERV-3 DOAS Energy re(ERV)ventilator 1 COMPLIES <br /> ERV-2 DOAS Energy re(ERV)ventilator 1 COMPLIES <br /> ERV-I DOAS Energy re(overyERV)ventilator 1 COMPLIES <br /> https://www.waenergycodes.com/print_project_summary_form.php?k=aWQ9Mjl2OTYmZnZpPTE3JmN0aT00Ng==&print=1 1/2 <br />