My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6305 36TH AVE W B 2024-06-26
>
Address Records
>
36TH AVE W
>
6305
>
6305 36TH AVE W B 2024-06-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 8:02:51 AM
Creation date
5/14/2024 1:46:02 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6305
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2312-008 Description:To plumb and install FOR COMMERCIAL TI-BLDG B <br /> Applied: 12/8/2023 Approved: 12/8/2023 Site Address: 6305 36TH AVE W <br /> Issued: 12/8/2023 Finaled:4/8/2024 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:Steve Carney <br /> Parent Permit: B2302-086 Owner: POWDERMILL PHASE 1 LLC <br /> Parent Project: Contractor:STATE MECHANICAL(PLUMBING)COMPANY <br /> Details: <br /> 4 Water closet,4 Lays,1 Sink, 1 Drinking fountain&1 Hot water tank W/Circ <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 02- JASON <br /> 1/23/2024 1/23/2024 GROUND MORRISSEY APPROVAL see notes <br /> WORK/SLAB <br /> Notes: <br /> 1/22/2024 1:37 PM Douglas Berry <br /> Requesting a PM inspection <br /> Contact Name:Douglas Berry <br /> Site Address:6305 36th Ave W,Everett WA 98203 <br /> Phone:2532597931 <br /> e-Mail:doug@northwayinc.com <br /> -Rough under slab DWV ok. <br /> 2/12/2024 2/12/2024 PLUMB 03-ROUGH JASON APPROVAL eTRAKiT Inspection Request <br /> IN MORRISSEY <br /> Notes: <br /> 2/9/2024 12:02 PM Douglas Berry <br /> Contact Name:Douglas Berry <br /> Site Address:6305 36TH AVE W <br /> Phone:2532597931 <br /> e-Mail:doug@northwayinc.com <br /> 3/28/2024 3/28/2024 PLUMB 08-FINAL** JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> 3/20/2024 5:54 PM Douglas Berry <br /> Contact Name:Douglas Berry <br /> Site Address:6305 36TH AVE W <br /> Phone:2532597931 <br /> e-Mail:doug@northwayinc.com <br /> -Cannot tie relief line and pan drain together per UPC 608.5 Discharge Piping.Ok to direct pan drain to concrete floor. <br /> I <br /> Printed:Tuesday, 14 May,2024 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.