Laserfiche WebLink
Kathy Collison <br /> From: Engineering / Public Services (PW) <br /> Sent: Saturday,July 16, 2022 9:02 AM <br /> To: Lakhjit Grewal <br /> Cc: Thad Newport; Cindy Bergsma <br /> Subject: PW1807-010--10524 13TH AVE W <br /> Hello, <br /> We have also been contacted by Joe with Omega. <br /> Thad will rework the fees for the above permit and we will reach out to you with the fee amounts owed for issuance. <br /> We do need a new application filled out by you, as the new owner. <br /> Please see hyperlink and send application back to me so I may update the file. Please also reference the above permit <br /> number. <br /> PUBLIC WORKS <br /> https://everettwa.gov/DocumentCenter/View/106 <br /> Thank you, <br /> — Cindy Bergsma <br /> Permit Technician I Permit Services <br /> 425.257.8810 1 3200 Cedar Street, 2"d Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: Monday- Friday : 8 a.m.— 12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From: Lakhjit Grewal <lakhjitgrewal@gmail.com> <br /> Sent: Friday,July 15, 2022 2:23 PM <br /> To: Engineering/Public Services (PW)<evteps@everettwa.gov> <br /> Subject: [EXTERNAL] Permit <br /> CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you <br /> recognize the sender and know the content is safe. <br /> Hello Thad, <br /> I bought a parcel located at 10524 13th ave w everett wa 98204.The parcel is approved for preliminary permit <br /> PREAPP#17-041 Public works project no.: SS1202-2018-002. I would like to continue with the permit process. Please <br /> guide me how to change the Project to my name. If the permit is issued now how long will it be valid? <br /> 1 <br />