Laserfiche WebLink
• 41, <br /> assessed value of the existing site improvements. (Ord. 3528-16§3(part), 2016: Ord. 3168-10 <br /> §3(part), 2010) <br /> MR#5: On-Site Storm water Management <br /> Project soils that are unsuitable for infiltration for the purposes of meeting flow control <br /> requirements (MR#7) may be feasible for on-site stormwater management BMPs to <br /> meet MR#5. The geotechnical information provided to this point does not adequately <br /> address the infeasibility criteria for on-site stormwater management BMPs—for these <br /> BMPs to be deemed infeasible, one or more of the specific infeasibility criteria must be <br /> cited for each BMP in List#2. <br /> For each type of surface in List#2 (lawn&landscaped, roofs and other hard surfaces),the <br /> BMPs must be evaluated in the order given in the list for the feasibility of each on-site <br /> stormwater management BMP. The feasibility criteria to be used are those given for <br /> each type of BMP in the appropriate section of the Stormwater Management Manual. <br /> MR#6: Runoff Treatment <br /> Per existing code,the site's new and replaced surfaces must be considered to determine <br /> if the 5,000 square foot threshold is met for runoff treatment—the 3,604 sf number <br /> doesn't appear to change, but "plus replaced" needs to be added to this section so it's <br /> clear that replaced surfaces are also being considered. <br /> MR#7: Flow Control <br /> It appears that MR#7 will be triggered when new plus replaced surfaces are considered. <br /> MR#9: Operation and Maintenance <br /> If MRs#6 or#7 must be met for this project,then maintenance and operation <br /> information for the stormwater facilities must be provided in a separate document <br /> entitled "Maintenance and Operations Manual This document must include a first <br /> page indicating the party responsible for maintenance and operation. In addition,the <br /> following language shall also be included in both the M&O manual and the drainage <br /> report. <br /> A copy of the maintenance and operations manual shall be retained on-site or <br /> within reasonable access to the site and shall be transferred with the property to <br /> any new owner. A log of maintenance activities that indicate what actions were <br /> taken shall be kept and be available for inspection by the City of Everett upon <br /> request. <br /> s:\jzimmerm\word\pr_8417 Evg Way <br />