My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5801 S 2ND AVE B 2024-11-07
>
Address Records
>
S 2ND AVE
>
5801
>
5801 S 2ND AVE B 2024-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 8:41:37 AM
Creation date
5/15/2024 9:05:14 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5801
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation <br />Lyashenko Accessory Dwelling Unit Development <br />5801 South 2nd Avenue <br />Everett, Washington <br />INTRODUCTION <br />This report presents the results of our geotechnical engineering investigation and evaluation of the <br />planned Lyashenko ADU development project in Everett, Washington. The project site is located at <br />5801 South 2"d Avenue, as shown on the Vicinity Map in Figure 1. The purpose of this study is to explore <br />and characterize the site's surface and subsurface conditions and to provide geotechnical <br />recommendations for the planned site development. <br />The site is currently occupied by an existing single-family residence within the central portion of the <br />property. Final development and grading plans have not been prepared at the time this report was <br />issued. However, we understand that the ADU will most likely be developed in the north -central to <br />northeastern portions of the property. Final stormwater plans have also not been developed, however, <br />we understand that stormwater may be directed to on -site infiltration systems, if feasible. The existing <br />site layout is shown on the Site Plan in Figure 2. <br />SCOPE <br />The purpose of this study is to explore and characterize the site surface and subsurface conditions, and <br />provide general recommendations for site development. Specifically, our scope of services included the <br />following: <br />1. Reviewing available soil and geologic maps of the area. <br />2. Exploring the subsurface soil and groundwater conditions within the site using a track - <br />mounted excavator. NGA provided the trackhoe. <br />3. Providing long-term design infiltration rates based on one on -site Small -Scale Pilot <br />infiltration Test (PIT), if feasible within the site. PIT to be performed in accordance with <br />the 2016 Snohomish County Drainage Manual. Water was provided by the client. <br />4. Providing recommendations for earthwork and foundations. <br />5. Providing recommendations for temporary and permanent slopes. <br />6. Providing recommendations for slab and pavement subgrade preparation. <br />7. Providing recommendations for site drainage and erosion control. <br />8. Determining feasibility of on -site storm water infiltration. <br />9. Documenting the results of our findings, conclusions, and recommendations in a written <br />geotechnical report. <br />NELSON GEOTECWNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.