My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5801 S 2ND AVE B 2024-11-07
>
Address Records
>
S 2ND AVE
>
5801
>
5801 S 2ND AVE B 2024-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 8:41:37 AM
Creation date
5/15/2024 9:05:14 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5801
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation <br />Lyashenko Accessory Dwelling Unit Development <br />Everett, Washington <br />NGA File No. 1165620 <br />April 10, 2020 <br />Page 14 <br />USE OF THIS REPORT <br />NGA has prepared this report for Mr. Stepan Lyashenko and his agents, for use in the planning and <br />design of the development on this site only. The scope of our work does not include services related to <br />construction safety precautions and our recommendations are not intended to direct the contractors' <br />methods, techniques, sequences, or procedures, except as specifically described in our report for <br />consideration in design. There are possible variations in subsurface conditions between the explorations <br />and also with time. Our report, conclusions, and interpretations should not be construed as a warranty <br />of subsurface conditions. A contingency for unanticipated conditions should be included in the budget <br />and schedule. <br />We recommend that NGA be retained to provide monitoring and consultation services during <br />construction to confirm that the conditions encountered are consistent with those indicated by the <br />explorations, to provide recommendations for design changes should the conditions revealed differ <br />from those anticipated, and to evaluate whether or not earthwork and foundation installation activities <br />comply with contract plans and specifications. We should be contacted a minimum of one week prior to <br />construction activities and could attend pre -construction meetings if requested. <br />Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br />with generally accepted geotechnical engineering practices in effect in this area at the time this report <br />was prepared. No other warranty, expressed or implied, is made. Our observations, findings, and <br />opinions are a means to identify and reduce the inherent risks to the owner. <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.