My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5801 S 2ND AVE 2022 Plans 2024-05-24
>
Address Records
>
S 2ND AVE
>
5801
>
Plans
>
5801 S 2ND AVE 2022 Plans 2024-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:41:29 PM
Creation date
5/16/2024 1:14:40 PM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5801
Permit
B2201-024
Year
2022
Notes
CONSTRUCT NEW ADDITIONAL DWELLING UNIT
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
94 REBAR WITHIN <br />TOP 6" OF WALL <br />HORIZONTALS <br />H VERTICALS <br />(2) #4 CONT. <br />HORIZONTALS IN FTG. <br />HEIGHT'H' IN <br />VERTICAL <br />HORIZONTAL <br />FEET <br />REINFORCING <br />REINFORCING <br />. NONE IF <br />MONOLITHIC <br />OTY. (1) #4 <br />0'- 2 <br />. #4 @ 4' O.C. & <br />WITHIN 6" OF <br />18" ABOVE FTG <br />TOP OF WALL <br />2'- 4' <br />#4 @ 24" O.C. <br />#4 @ 24" O.C. <br />(D 4'-6' <br />#4@12„O.C. <br />#4@121,0C. <br />1D FOOTING FOR 4'- 6' FOUNDATION TO BE 24" <br />WIDE X 8" THICK AND STEM WALL TO BE 8" WIDE. <br />FOUNDATION REINFORCING <br />SCALE: 3/4" = V - 0" <br />ANCHOR BOLTS <br />1. 05/8"X10" LONG <br />2. MIN. 2 PER SILL. <br />1-3/4" 3. WITHIN 12" FROM SILL END. <br />MIN. <br />REQUIRED AT <br />ALL LOCATIONS <br />SHEATHING AND 5FEAR <br />WALL EDGE NAILING PER <br />5HEAR WALL 5GHIM ULE, <br />TYP. (WI -ERE OCOUR5) — <br />RIM J015T OR <br />BLKG. AS OC .R5 <br />TYPICAL POST AT FLOOR <br />NOTE <br />FRAMING CONDITIONS VARY, <br />FOR INFORMATION NOT <br />NOTED SEE PLAN 4 <br />APPROPRIATE DETAILS <br />SOLID W000 BLKG, BELOW <br />P05T TO MATCH P05T SIZE, <br />INSTALL WOOD GRAIN <br />VERTICALLY <br />(2) IOd-F TOENAILS TOP <br />AND BOTTOM <br />FLOOR FRAMING A5 OCaIR5, <br />BLOCK REMAINDER OF BEARING <br />SOLID AS INDICATED, <br />POST PER PLAN <br />" OSB 2X6 STUD WALL <br />RIM JOIST / FLOOR JOIST PER PLAN 18" <br />/CLEAR JOIST TO EARTH 12" <br />CLEAR BEAM TO EARTH <br />#4 CONT. AT TOP <br />OF STEM WALL <br />4" DIA. TIGHT LINE <br />4" DIA. PERF DRAIN <br />PIPE SET IN GRAVEL <br />ANCHOR BOLTS TO SILL PLATE <br />FLOOR ,,:i _- PER PLAN, r-BLOCKING REQ'D <br />4X10 OF BEAM <br />2X4 POST TO BEAM <br />#4 REBAR OR OTHER <br />W/ 16D @ 4" O.C. <br />POSITIVE CONNECTION g <br />4X4 PT POST4X6 <br />(3) #4 REBAR <br />@ BEAM SPLICE <br />EACH WAY <br />6 MIL VISQUEEN . <br />—24" SQ. <br />C POST AND BEAM <br />SCALE: 3/4" = 1' - 0" <br />�OR <br />FLOOR JOIST PER PLAN -I /-BLOCKING REQ'D <br />BC6 POST <br />6X6 PT <br />5HEAR UJ4LL SCHEDULE NCTES <br />I. SHEAR WALLS NOTED IN SCHEDULE ARE WALLS WITH ADDITIONAL EDGE NAILING, <br />ABUTTING HORIZONTAL AND VERTICAL EDGE FRAMING, AND ANCHOR BOLT SPACING. <br />FIELD NAIL SIZE SHALL MATCH THE EDGE FRAMING SPECIFIED AND BE SPACED AT 12' <br />O.G. SHEAR NAILING APPLIES TO ALL VERTICAL AND HORIZONTAL ABUTTING SHTG. <br />EDGES, DOUBLE TOP PLATES, AND SOLE PLATES. <br />2. ALL EXTERIOR WALLS NOT SPECIFIED IN SHEAR WALL SCHEDULE, SHALL BE DESIGNATED <br />AS MINIMUM SHEAR PANELS WITH EDGE NAIL SIZE MATCHING SPECIFIED NAILS IN <br />SCHEDULE AND SPACED AT 6' O.C. FIELD NAIL SPACING SHALL BE 12' O.C. <br />3. SHEATHING SHALL BE 7/16' OSB UNLESS SPECIFIED 15/32' STRUCTURAL 01 IN SCHEDULE. <br />4. EXTERIOR SHEAR WALL FRAMING SHALL BE 2X6 HEM FIR 02 UNLESS NOTED 'DF' (DOUG <br />FIR) IN SCHEDULE. FRAMING SHALL BE SPACED AT 16' O.C. <br />5. INTERIOR SHEAR WALL FRAMING SHALL BE 2X4 (OR 2X(o PER SCHEDULE) HEM FIR 02 <br />SPACED AT 16' O.C. <br />Fi. EDGE FRAMING OR END OF SHEAR WALLS SHALL BE FRAMED WITH: (2) MINIMUM 2X6 (2X(b <br />WALLS), (2) 2X4 (2X4 WALLS), OR SOLID SAWN POSTS AS NOTED IN THE SCHEDULE. <br />1. BLOCK ALL UNSUPPORTED HORIZONTAL SHEATHING EDGES WITH 2X6 OR 3X6 AS NOTED <br />IN SCHEDULE. ALL VERTICAL ABUTTING SHEATHING EDGES SHALL BE 2X6 FOR EXTERIOR <br />WALLS OR 2X4 FOR INTERIOR WALLS OR AS NOTED IN SCHEDULE. <br />5. SOLE PLATE SHALL BE 2X6 FOR EXTERIOR WALLS. SOLE PLATE SHALL BE 2X4 OR 2X6 <br />FOR INTERIOR WALLS. SOLE PLATE NAILING SHALL BE 16d SPACED 12' O.0 (MAX. OR <br />LESS AS SPECIFIED IN SCHEDULE) <br />6" IN. \ -2X6 P.T. MUD SILL <br />g DIA. X 10 ANCHOR BOLTS @ 48" <br />O.C. 7" MIN. EMBEDMENT INTO CONC. <br />VERTICAL BARS SEE REBAR TABLE <br />12 <br />ORIZONTAL BARS SEE REBAR TABLE <br />fi <br />(2) #4 CONT. REBAR <br />16" <br />B FOUNDATION DETAIL <br />SCALE: 3/4" = 1' - 0" <br />PT BEAM <br />SIMPSON ABU66 <br />POST BASE <br />(2) 14 BARS <br />EACH WAY <br />s �\ <br />E SONO-TUBE DETAIL <br />SCALE: 3/4" = 1'- 0" <br />010 DF BEAMS <br />2X4 POST TO BEAM---'#4 REBAR OR OTHER <br />W/ 16D @ 4" O.C. POSITIVE CONNECTION 2 <br />4X6 PT POST @ 6' (2) #4 CONT. REBAR m <br />O.C. MAX <br />6 MIL VISQUEENA N <br />16" CONT. <br />GRADE BEAM W/ <br />POST AND BEAM <br />OPTIONAL <br />DECORATIVE BEVEL <br />y-- X6 PT POST <br />SIMPSON CBSQ66-SDS2 <br />12" SONO-TUBE <br />SQUARE OR ROUND <br />Li <br />(4) #4 VERTICAL <br />0 <br />w LU a HOOKS <br />ED <br />Z � <br />m <br />10" <br />a <br />(4) #4 REBAR <br />, _PER PLAN EACH WAY <br />D SONO-TUBE DETAIL <br />SCALE: 3/4" = V - 0" <br />(2) HOLD DOWN OPTIONS: <br />IT IS ACCEPTABLE TO USE EITHER HDU <br />OR STHD14 HOLD DOWN AT CONCRETE <br />SLAB LOCATIONS. <br />3" MIN WOOD <br />- _-- - <br />THICKNESS <br />O <br />FASTEN TO POST WITH <br />—FASTEN TO POST WITH <br />m <br />m <br />1/4"X2-1/2" SDS SCREWS <br />(22) 16d SINKERS <br />3" MIN WOOD THICKNESS <br />STRAP TO BE INSTALLED ON <br />OUTSIDE OF SHEATHING <br />(NOT SHOWN FOR CLARITY) <br />P.T. SILL PLATE <br />-2X6 PT SILL <br />-SIMPSON SSTB OR <br />. - <br />D <br />ROD PER DETAIL <br />o�. <br />FOUNDATION <br />St <br />REINFORCING <br />" <br />PER PLAN <br />I I <br />I I <br />• <br />fT�i1 D <br />bt/ <br />TN�W HOLD DOWN DETAIL N THOU H9LQ_D9WN DETAIL <br />sCALE:"T S CONCRETE SLAB SCALE: N.T.S. C NCRETE SLAB <br />STUD <br />DEPTH <br />V_VA Fv, Ra1 <br />MIN. DEPTH <br />MIN. 5/8" <br />EDGE <br />P15T (TYP) <br />Q7 <br />I <br />STUD DEPTH <br />MAX. DIAMETER <br />OF HOLES <br />HOLES ARE TO BE <br />5PAGED AT LEAST <br />A STUD DEPTH <br />�I <br />FROM A CUT OR <br />NOTCH <br />In <br />�D <br />I <br />1 <br />± <br />HOLES ARE TO BE <br />SPACED AT LEAST <br />TWICE THE <br />DIAMETER OF THE <br />LARGEST HOLE <br />A. CUTTING AND NOTCHING WOOD 5TUD5 <br />(DO NOT NOTCH MORE THAN 3 ADJACENT 5705 w/o REVIEW BY ENGINEER) <br />BEARING AALL 5=5: <br />STUD MAX. DEPTH OF <br />MIN. DEPTH REMAINING <br />51ZE SAW CUT OR NOTCH <br />AFTER CUi OR NOTCH <br />2X4 7/6' <br />2-3/6' <br />2xb 1-3/8' <br />4-1/8' <br />2x8 1-1/8' <br />5-3/8' <br />NON -BEARING WALL STUDS: <br />STUD MAX. DEPTH OF <br />MIN. DEPTH REMAININ6 <br />517E SAN CUT OR NOTCH <br />AFTER CUT OR NOTCH <br />2x4 1-1/2' <br />2' <br />2xb 2-3/8" <br />24 3' <br />4-I/4" <br />HOLES IN ROOD STUDS <br />BEARING WALL: <br />STUD MAX DIAMETER <br />SIZE OF HOLE <br />2x4 1-1/2' <br />2xb 2-3/8" <br />2x8 3" <br />NON-BEARINS WALL: <br />STUD MAX DIAMETER <br />51ZE OF HOL. <br />2x4 2-1/4" <br />1 <br />NOTES: cU (U <br />ALL LOAD BEARING HEADERS TO BE 4X10 DF <br />G1 0, 01 <br />OR 6X8 #2 UNLESS NOTED OTHERWISE- I I <br />ADDITIONAL JOIST REQUIRED UNDER ALL INTERIOR WALLS <br />» <br />Q <br />� <br />_J <br />C3 <br />Q <br />W <br />__ <br />Q <br />W <br />Q <br />ca <br />Z <br />Z <br />Z <br />W <br />LJ <br />� <br />� <br />3 <br />Y <br />u <br />Y <br />u <br />O_ <br />W <br />F- <br />C4 <br />Q <br />LW <br />Li <br />4x10 D.F. #2 <br /><L <br />ra <br />Ca <br />u <br />u <br />ED <br />f e 1 r� <br />---- — -- <br />3 5' <br />12' - 3 1 / 2` PT 2X6 D.F #2 <br />� 5 DECK m <br />B I2'-8" X 8'-0" HDU80R� <br />HDUB OR 52 STHD14 I <br />STH014 S W 4 sasonH _ 1 — — mm.- — — — (U <br />--------------------- <br />I I <br />I I I <br />I <br />I 1 I I <br />t`i1 I I SW4 Ed Hell. 2S3' D.C.Puly t_g ,dg_1 12, .c u11 I 1 <br />hold I.— — required. <br />I <br />S2 I w <br />v.II _ —2 -------- <br />- - - - - - - - -------------------- - - - <br />I I 912" TJI 210 JOISTS4�1 <br />or 2x8 or 2X10 D.F 1 <br />1 #2@16"O.C. B 1W4 <br />1 c s2 I I <br />S2 1 <br />---- lit- --- <br />I— — --- — — — — — — — — — — — — — — 1 <br />I I <br />I B I <br />52 <br />— — — — — — — — — — — — <br />I Fr. <br />1 I 1 HDUB OR <br />I B I <br />s2 1Cw4 <br />— — — — — — — — — — <br />SW4 <br />HDUB ORj <br />STHD14 <br />13'-9 i/2 <br />V <br />PT 2X6 D.F #2 <br />4x10 D.F. #2- <br />W/HUC0410� <br />E 4x4 PT POST <br />CONTINUOUS ROM <br />FOOTING TO ROOF E <br />,----����\ I I <br />`30"X30" CONC. <br />FOOTING W/ (4) #4 <br />BARS EACH WAY <br />.2xb3-3/8' 24 4-1/2'FOUNDATION AND MAIN FLOOR FRAMING PLAN <br />TYPICAL ALLOAABLE HOLES AND NOTCHES IN STUDS G( SCALE: 1 /4" = 1' - 0" <br />IOd FACE NAILS Ir/ THE <br />THICKNESS <br />SAME 5PACIN6 AS THE <br />FAST EN TO POST <br />(22)16E SINKERS <br />PANEL EDGE NAILING <br />PER THE SHEAR AALL <br />STRAP TO BE INSTALLED ON <br />OUTSIDE OF SHEATHING <br />5GHEDULE (SE NOTE I <br />(NOT SHOWN FOR CLARITY) <br />AT NON -SHEAR AALL5) <br />2X6 BOTTOM PLATE <br />SHEATHING AND c AR <br />3W CD OR OSB <br />KALL EDGE NAILING PER <br />RIM JOIST PER PLAN <br />SHEAR WALL 50HEDULE <br />(WHERE OCCURS) <br />• <br />2X6 P T. SILL <br />_ <br />0 NDATION <br />REINFORCING <br />PER PLAN <br />M STHD14RJ HOLD <br />DOWN DETAIL <br />SCALE NTS <br />(2) HOLD DOWN OPTIONS <br />IT IS ACCEPTABLE TO USE EITHER HDU2 <br />OR STHD14RJ HOLD DOWN AT RIM JOIST <br />LOCATIONS. <br />BEIEATH POIRT LOAD <br />SHEATRIW ARD— ROT SHw.N <br />FOR auaTr <br />OKAY TO USE SiMPSpJ GNN <br />COURER TO Ex1END ROD. <br />�-P T 9LL PIATE <br />--SMIPSOR SSTH OR <br />♦ r -.ROD PER pETAIL O'. 51 <br />-CONCRETE WOTING <br />(qm Hz HOLD_DOWN DETAIL - <br />SCALE: N.T.SRIM JOIST <br />Typ—I DTT1Z Dedc-lo-Ho Typo DTT2Z De k10-(base <br />L t Load Conredbn Lateral Loaf Connection <br />For more bloert — m iab21 bad For nwre mbrnation on IMerzl loan <br />mnnecTons, fee Ndlnol EMCetin mnnectiorls, see technitai GUMelin <br />Cu <br />V) <br />N <br />Z <br />O <br />W <br />z <br />z <br />Q <br />Q <br />z <br />LAJ <br />CL <br />z 1z <br />> <br /><1z <br />CID <br />Q o <br />F— <br />o� <br />�� <br />oT <br />L03 <br />3 <br />~ <br />�Z <br />U-) � <br />LL <br />Q <br />(^ <br />F<ELd <br />O W <br />uEJ <br />Li <br />LLJ <br />cl <br />� <br />0 <br />/W� <br />0 <br />I �i <br />CL <br />.�y OTun -rf n. <br />In w. <br />ty z A <br />"G`GQ "�.�'i <br />Lj <br />J <br />J <br />� 2 <br />0to <br />w <br />0 <br />+�uJ <br />Lu <br />w <br />z <br />i.-. W <br />v J <br />1 O <br />
The URL can be used to link to this page
Your browser does not support the video tag.