Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PLUMB-SITE JASON <br /> 6/23/2022 6/23/2022 READINESS MORRISSEY NOT READY <br /> RECHECK <br /> Notes: <br /> ABRAHAM.GEDEBO@GMAIL.COM <br /> (6/23/2022 1:46 PM JJM) <br /> Expose all unapproved work(including electrical,mechanical,plumbing,and framing systems etc.)installed/altered without permits and inspection <br /> approval. <br /> 7/28/2022 7/28/2022 MECH 04-ROUGH JASON CANCELLED <br /> IN MORRISSEY <br /> Notes: <br /> Replace small section of flex duct on range vent with ridged ducting per IMC sec 505 exhaust. <br /> Insulate bathroom and kitchen exhaust with minimum r-8 insulation per WSEC.(Insulate duct within attic space to prevent condensation. <br /> Insulate dryer vent in crawlspace and provide dryer spec showing vent can be run over 35'per IMC. <br /> PLUMB-SITE JASON <br /> 7/28/2022 7/28/2022 READINESS MORRISSEY READY <br /> RECHECK <br /> Notes: <br /> ABRAHAM.GEDEBO@GMAIL.COM <br /> 7/28/2022 7/28/2022 PLUMB 03-ROUGH JASON CORRECTION <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> To many corrections to list.here are a few to start. <br /> 2 by 11/2"San tee on vent in closet is upside down. Rotate 180 degrees per UPC 2018 chapter 9. <br /> Replace vent tie in attic above bathroom adjacent to garage at transition between 2"copper and 11/2 ABS.Transition bands must be metal shielded <br /> (mission type band)for indoor use.It looks as though the bottom side of the 2"vent dead ends in the wall,this needs to be removed if not tied in to <br /> other fixtures. <br /> Install nail plates on ABS pipe in closet or any where else where ABS penetrates framing that will be recieve drywall per UPC 2018.18 gauge. <br /> Bring all drain,waste,vent and water distribution lines in crawlspace/home up to 2018 UPC with WA amendments.(Recommend licensed plumbing <br /> contractor to make repairs.)Waste system will need to be put on water test through roof vents. <br /> Toilets require 2"vents through the roof per UPC Chapter 9 vents. <br /> Drains need to grade at 2%slope per UPC chpter 7. <br /> Support ABS every 4'on the horizontal. <br /> Support PEX every 32". <br /> Insulate all water distribution piping in crawlspace. <br /> 8/19/2022CORRECTION <br /> IN MORRISSEY REQUIRED <br /> F8/19/2022 PLUMB 03-ROUGH JASON <br /> Notes: <br /> abraham.gedebo@gmail.com <br /> (8/19/2022 9:23 AM JJM) <br /> Bathroom Next to Garage,crawlspace corrections: <br /> Reroute kitchen drain to tie in downstream of toilet vent.Kitchen drain can't tie into trap arm for toilet.Per 2018 UPC chapter 10. <br /> Replace wye on closet bend with a 90 and install 3"end of line clean-out downstream of 90. <br /> Replace medium turn 90 on toilet vent with a long turn per chapter 7&9,2018 UPC. <br /> I <br /> Printed:Tuesday,30 April,2024 2 of 3 rk <br /> SUPERION <br />