Laserfiche WebLink
{ <br /> ance with plans and specifications prepare b7Ytb, City ingineer; <br /> now therefore, <br /> THE C I 'Y OP EVERETT 'DCE8. QRDAI is <br /> Section 1. That McDougall Avenue, from 16th Street to 24th <br /> Street, 24th Strcet from Broadway to Virginia; 25th Street from <br /> Broadway to Virginia; 26th Street from Broadway to Virginia; Rain- <br /> ier from 24th Street to ? veret.t Avenue and McDougall from 25thStreet <br /> to 26th Street be improved by grading to proper grade, removal of <br /> old lumber, .construction of concrete curbs, installation of neces- <br /> sary drainage, making necessary water main changes, and doing all <br /> other work necessary to make a cornplcete improvement; also McDougall <br /> Avenue from 16th Street to 24th Street; 24th Street from Broadway <br /> to Rainier, and 25th Street from Broadway tQ' rainier be improved <br /> by the construction of a 6 inch Portland cement concrete pavement <br /> gl feet wide, and doing all other work necessary to make a complete <br /> improvement ; also 26th :.street from Broadway to Rainier; McDougall <br /> Avenue fran 25th Street to 26th Street; Rainier Avenue from . verett <br /> Avenue to 24th Street be improved by the construction of a 6 inch <br /> Portland' cement concrete pavement 32 feet wide; also 24th Street <br /> from La:inier to Virginia, 25th Street from taini er to Virginia, and <br /> 26th Street from. Rainier tee vironia be improved by the construction <br /> of a 6 inch Portland cement concrete pavement 24feat wide; also the <br /> parking strips around the Junior nigh School District in Block 568, <br /> be improved <br /> Rucker' s Third Addition to verett, /by the construction of a 4 inch <br /> concrete walk full width between the curbs and esent sidewalks, <br /> nd. doing 8.11 other work necessary to make a comnlete improvement, <br /> according to the plans and specifications, prepared under the direc- <br /> tion of the City .Engineer, which plans and specifications are here- <br /> by adopted and approved. <br /> Section 2. That the cost and expe±ise of such improvement <br /> including all necesary incidental expenses, shall be borne by and <br />