Laserfiche WebLink
• (2) That portion of any construction. work and equipment intended to be ~ , <br /> concealed shall not be concealed until inspected and approved. <br /> (3) Neither the City not the Building Official nor his duly appointed assistant <br /> shall be liable for any expense entailed in the removal or replacement of any <br /> material required to allow an inspection. <br /> (4) The Building Official may require that every request for inspection be filed at <br /> least one day before such inspection is desired. <br /> 80-12 ELECTRICAL PERMIT FEES. A fee for each electrical permit shall be paid to the <br /> Building Official as set forth herein: <br /> Type of Work Fee <br /> Residential (service) <br /> 100 Amp Service $ 35 <br /> 101 to 200 Amp Service $ 55 <br /> 201 and larger Amp Service $ 75 <br /> Altered Circuits (each) $ 35 (minimum) <br /> Mobile Home Hookup $ 35 <br /> Meter Move $ 35 <br /> Low Voltage Circuits $ 35 <br /> Temporary Service <br /> 1 to 125 Amp Service $ 35 <br /> 126 to 200 Amp Service $ 35 <br /> Swimming Pool/Hot Tub $ 35 <br /> Signs $ 35 <br /> Commercial (Based upon Contract Price/Time and Materials) <br /> $250 or less $ 35 <br /> $251 to $1,000 $ 30 + 3% of cost <br /> $1,001 to $5,000 $ 47 + 3% of cost <br /> $5,001 to $50,000 $ 175 + 1.5% of cost <br /> $50,001 to $250,000 $ 925 + .9% of cost <br /> 250,000 to $1,000,000 $ 3,175 + .7% of cost <br /> 5 <br />