My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/05/22 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/05/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 9:57:39 AM
Creation date
5/23/2024 8:34:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: A Professional Service Agreement with Hultz BHU Engineers Inc. to Provide Architectural and <br />Engineering Services for the Main Library HVAC Replacement Project <br />Council Bill # <br /> <br />Project: Main Library HVAC Replacement Project <br />Partner/Supplier: Hultz BHU Engineers Inc. <br /> Location: 2702 Hoyt Ave <br />Preceding action: Funding Ordinance 4023-24 <br />Fund: Fund 342 – Program 041 (CIP-1) <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />Proposed action <br />Proposed action <br />Consent 05/22/2024 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />PSA <br /> <br /> <br />Department(s) involved: <br />Parks & Facilities <br />Administration <br />Library <br /> <br />Contact person: <br />Bob Leonard <br /> <br />Phone number: <br />425-257-8335 <br /> <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />RML <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The proposed Professional Service Agreement with Hultz BHU Engineers Inc. is for architectural <br />and engineering services for the Main Library HVAC Replacement Project. Source of funds for the <br />project will be paid from Fund 342, Program 041 (CIP-1). The estimated design cost is not to <br />exceed $360,000. <br /> <br />Project summary statement: <br />The City of Everett intends to redesign and replace the entire HVAC system at the Everett Main <br />Library. The current system is no longer reliable or efficient. The replacement of these old <br />systems will make the buildings much more efficient to heat and air condition. Additionally, this <br />work will bring the building in line with the new Washington State Clean Building Performance <br />Standard. This work will provide a much more improved working environment for City <br />employees and the public that utilize this building. <br /> <br />The scope of service includes complete design services for the replacement of the entire HVAC <br />system at the Main Library. Upon completion of the design work, Parks & Facilities staff will <br />return to City Council to amend the Ordinance for construction. <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign a Professional Service Agreement Hultz BHU Engineers Inc. <br />to provide architectural and engineering services for the Main Library HVAC <br />Replacement Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.