My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4030-24
>
Ordinances
>
Ordinance 4030-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 12:05:07 PM
Creation date
5/23/2024 12:04:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4030-24
Date
5/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
15 <br /> <br />shall be subject to the remedies herein, including cost recovery, enforcement and <br />penalties. <br />2.8 Additional Pretreatment Measures <br /> <br />A. When deemed necessary, the Director may require users to restrict their discharge <br />during peak flow periods, designate that certain wastewater be discharged only into <br />specific sewers, relocate and/or consolidate points of discharge, separate sewage <br />wastestreams from industrial wastestreams, and such other conditions as may be <br />necessary to protect the POTW and determine the user's compliance with the <br />requirements of this ordinance. <br />B. When determined necessary by the Director, each user discharging into the POTW, <br />shall install and maintain, on the user’s property and at the user’s expense, a suitable <br />storage and flow-control facility to ensure equalization of flow. The Director may <br />require the facility to be equipped with alarms and a rate of discharge controller, <br />the regulation of which shall be determined by the Director. A wastewater <br />Discharge Authorization (DA) may be issued solely for flow equalization.
The URL can be used to link to this page
Your browser does not support the video tag.