Laserfiche WebLink
15 <br /> <br />shall be subject to the remedies herein, including cost recovery, enforcement and <br />penalties. <br />2.8 Additional Pretreatment Measures <br /> <br />A. When deemed necessary, the Director may require users to restrict their discharge <br />during peak flow periods, designate that certain wastewater be discharged only into <br />specific sewers, relocate and/or consolidate points of discharge, separate sewage <br />wastestreams from industrial wastestreams, and such other conditions as may be <br />necessary to protect the POTW and determine the user's compliance with the <br />requirements of this ordinance. <br />B. When determined necessary by the Director, each user discharging into the POTW, <br />shall install and maintain, on the user’s property and at the user’s expense, a suitable <br />storage and flow-control facility to ensure equalization of flow. The Director may <br />require the facility to be equipped with alarms and a rate of discharge controller, <br />the regulation of which shall be determined by the Director. A wastewater <br />Discharge Authorization (DA) may be issued solely for flow equalization.