Laserfiche WebLink
35 <br /> <br />(a) Bypass was unavoidable to prevent loss of life, personal injury, or <br />severe property damage; <br />(b) There were no feasible alternatives to the bypass, such as the use of <br />auxiliary treatment facilities, retention of untreated wastes, or <br />maintenance during normal periods of equipment downtime. This <br />condition is not satisfied if adequate back-up equipment should have <br />been installed in the exercise of reasonable engineering judgment to <br />prevent a bypass which occurred during normal periods of <br />equipment downtime or preventive maintenance; and <br />(c) The user submitted notices as required under paragraph (C) of this <br />section. <br />(2) The Director may approve an anticipated bypass, after considering its <br />adverse effects, if the Director determines that it will meet the three <br />conditions listed in paragraph (D)(1) of this section.