My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
816 91ST PL SE 2024-06-06
>
Address Records
>
91ST PL SE
>
816
>
816 91ST PL SE 2024-06-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2024 7:52:33 AM
Creation date
5/28/2024 11:31:35 AM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SE
Street Number
816
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Forecast Solar LLC<Office@forecastsolar.com> <br /> Sent: Friday, December 15,2023 2:43 PM <br /> To: Audrey Arbow <br /> Subject: Re: [EXTERNAL] Re: Permit Approval: Permit#B2312-017 at 816 91ST PL SE <br /> Attachments: Code Change Alert-Solar PV Systems.pdf; Rapp-Everett-Contract Pg 1.pdf <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> Category 2:Sensitive information <br /> Aubrey, <br /> The proposal is attached.The valuation for the structural components and labor is$7,680. <br /> Attached is the state emergency ruling and permit valuation process. Below is the relevant excerpt. <br /> 2. Valuation based fee. For systems that do not qualify for the over-the-counter building permit process, <br /> it is recommended that a valuation-based fee be charged for the permit. Costs for building permits are <br /> often based on the total project cost, assuming that the cost of the project accurately represents the <br /> scale of the project and the level of permit review required. However, with a rooftop solar photovoltaic <br /> installation, the equipment costs are much higher than with conventional projects of similar scope. It is <br /> therefore recommended that the permit fee for a rooftop solar photovoltaic system be calculated based <br /> on a valuation of the structural components and labor only.The value of the electrical components, <br /> including the solar modules and inverters, is subtracted from the overall valuation because these <br /> elements are not looked at as part of the structural inspection. <br /> Thanks, <br /> Morgan Zehrung <br /> Forecast Solar LLC <br /> 425-487-6000 office <br /> 360-860-1129 cell <br /> www.forecastsolar.com <br /> Category 2: For official use only/disclosure permissible by law. <br /> From: Audrey Arbow<AArbow@ eve rettwa.gov> <br /> Date: Friday, December 15, 2023 at 2:05 PM <br /> To: Forecast Solar LLC <Office@forecastsolar.com> <br /> Subject: RE: [EXTERNAL] Re: Permit Approval: Permit# B2312-017 at 816 91ST PL SE <br /> Category 2:Sensitive information <br />
The URL can be used to link to this page
Your browser does not support the video tag.