Laserfiche WebLink
Contents <br /> 1.0 INTRODUCTION 5 <br /> 1.1 PURPOSE 5 <br /> 1.2 STATEMENT OF QUALIFICATIONS 5 <br /> 2.0 METHODS 5 <br /> 2.1 OFFICE RESEARCH 5 <br /> 2.2 SITE DESCRIPTION 6 <br /> 2.3 PROJECT DESCRIPTION 6 <br /> 2.4 WETLAND DETERMINATION 6 <br /> 2.5 STREAM DETERMINATION 6 <br /> 3.0 RESULTS 7 <br /> 3.1 OFFICE RESEARCH 7 <br /> 3.2 WETLAND DETERMINATION 7 <br /> 3.3 STREAM DETERMINATION 8 <br /> 3.4 OFFSITE CRITICAL AREAS 8 <br /> 3.5 EXISTING FUNCTIONS AND VALUES 8 <br /> 4.0 PROJECT IMPACTS AND MITIGATION 8 <br /> 4.1 PROPOSED IMPACTS 9 <br /> 4.1.1 Reasonable Use Review Criteria 9 <br /> 4.2 PROPOSED MITIGATION MEASURES 9 <br /> 4.3 POST CONSTRUCTION FUNCTIONS AND VALUES 10 <br /> 5.0 GOALS, OBJECTIVES,AND PERFORMANCE STANDARDS 10 <br /> 6.0 MONITORING 11 <br /> 6.1 GENERAL 11 <br /> 7.0 MONITORING SCHEDULE 11 <br /> 7.1 TIME-ZERO REPORT: 12 <br /> 7.2 MONITORING REPORTING 12 <br /> 7.3 PERFORMANCE SECURITY BONDING ESTIMATE 13 <br /> 8.0 CONCLUSIONS 13 <br /> 9.0 REFERENCES 14 <br /> APPENDIX A: NATURAL RESOURCE MAPS AND SITE PHOTOS 17 <br /> APPENDIX B: CRITICAL AREA MAPS 24 <br /> APPENDIX C:WETLAND DETERMINATION 29 <br />