Laserfiche WebLink
PUBLIGNORKS PERMIT Date Applied: 4i32018_ <br /> City of Everett Permit Services Public Works Permit#: PW1804-041 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B1803-048 <br /> Everett,WA 98201 Planning Reference#: REVI116-016 <br /> (425) 257-8810 Public Works Fee: $160.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> LEWIS VANESSA M LEWIS VANESSA M <br /> P0 BOX 12717 PO BOX 12717 <br /> EVERETT,WA, 98206 EVERETT,WA, 98206 <br /> PHONE: 4253302453 PHONE: 4253302453 <br /> TAX PARCEL ID#: 00437578601900 SITE ADDRESS: 3333 NASSAU ST <br /> DESCRIPTION: SITE WORK FOR NEW SFR <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 4/24/2018.Approved <br /> plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. No grading or foundation work to take place during the wet season (Nov I through March 31)per Geotechnical Report. <br /> 8. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 9. Protect all existing underground utilities during construction. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new impervious surfaces will be managed on- <br /> site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Schedule the <br /> existing Planning Landscape inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online <br /> by selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> Public Works Permit Fee Breakdown: <br /> Paving (1543sf) $45.00 <br /> Erosion Control $50.00 <br /> Misc. Minor(Drainage Work) $25.00 AUG 2 7 2019 <br /> PW Plan Review $20.00 <br /> PWSite Inspection $20.00 - <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> / 1/� <br /> / expenses,or causes of action that may arise because of installation and <br /> Y/ / <br /> 7 maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and fyrth- .gr:-s to remove same upon notice from the City and to <br /> replace c pr.eerty damaged thereby. <br /> .9/1 <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) gnature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> l Its <br />