My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3333 NASSAU ST 2024-08-07
>
Address Records
>
NASSAU ST
>
3333
>
3333 NASSAU ST 2024-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 12:04:26 PM
Creation date
5/28/2024 11:35:20 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU ST
Street Number
3333
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Constructic)n Erosion and Sedimentation Control Plan for <br /> if Small Projects <br /> Single Family ItesidentialDuplex <br /> -AAA A <br /> ‘46w <br /> Construction Stormwater Plan - <br /> All new development and redevelopment projects are responsible for preventing erosion and <br /> sedimentation during construction.Each of the 13 requirements below contains a list of BMPs that are <br /> accepted by the Department of Ecology for satisfying each requirement. (For more information on each <br /> BMP,please go to Chapter 4 in Volume II of Ecology's Stormwater Management Manual for Western <br /> Washington:httos7j/fortress.wa.gov/ecvLpublications/Darts/14100 55part4.0df). <br /> Please select all BMPs that you will be using to satisfy each requirement,and where applicable,show <br /> these items on a map of your project.All requirements must have at least one item selected: <br /> 1. Preserve Vegetation/Mark Clearing Limits: <br /> XI BMP C101:Preserving Natural Vegetation <br /> [XIBMP C102: Buffer Zones <br /> OBMP C103: High Visibility Plastic or Metal Fence <br /> 2. Establish Construction Access: <br /> [XI BMP C105:Stabilized Construction Entrance/Exit <br /> ElBMP C106:Wheel Wash <br /> OBMP C107:Construction Road/Parking Area Stabilization <br /> 3. Control Flow Rates: <br /> EIBMP C203:Water Bars <br /> OBMP C240:Sediment Trap <br /> OBMP C241:Temporary Sediment Pond <br /> [X]Not Applicable To My Proposed Project <br /> 4. Install Sediment Controls: <br /> OBMP C231: Brush Barrier <br /> OBMP C232:Gravel Filter Berm <br /> IN BMP C233:Silt Fence <br /> OBMP C234:Vegetated Strip <br /> OBMP C235:Wattles <br /> OBMP C240:Sediment Trap <br /> OBMP C241:Temporary Sediment Pond <br /> 5. Stabilize Soils: <br /> EXIBMP C120:Temporary and Permanent Seeding <br /> EIBMP C121: Mulching <br /> OBMP C122: Nets and Blankets <br /> ElBMP C123:Plastic Covering <br /> OBMP C124:Sodding <br /> OBMP C125:Topsoiling/Composing <br /> OBMP C126:Polyacrylamide for Soil Erosion Protection <br /> OBMP C130:Surface Roughening <br /> OBMP C131:Gradient Terraces <br /> OBMP C140:Dust Control <br /> Page kof2 <br /> ( VElsi I ; 3)00( :)1rt f- <br />
The URL can be used to link to this page
Your browser does not support the video tag.