Laserfiche WebLink
October 3, 2016 <br /> Single4samily Residence <br /> L&A Job No. 16-124 <br /> Page 13 <br /> EXCAVATION AND FILL SLOPES sections of this report Ground steeper than 15% <br /> grade should be cut into level benches with vertical steps not higher than 3 feet after the <br /> surficial weak soils are stripped. Structural fill should be placed in lifts no more than 10 <br /> inches thick in its loose state, with each lift compacted to a minimum percentage of the <br /> maximum dry density determined by ASTM D1557 (Modified Proctor Method) as <br /> follows: <br /> Application %of Maximum Dry Density <br /> Within building pads and under foundations 95% <br /> Roadway/driveway subgrade 95% for top 3 feet and 90%below <br /> Retaining/foundation wall backfill 92% <br /> Utility trench backfill 95%for top 4 feet and 90%below <br /> In-situ density of structural fill should he tested with a nuclear densometer by a testing <br /> agency specialized in fill placement and construction work. Testing frequency should be <br /> one test per every 250 square feet per lift of filL <br /> BUILDING FOUNDATIONS <br /> Conventional footing foundations may be used to support the house. The footing <br /> foundations should be constructed at least one foot into the underlying very-dense <br /> cemented glacial till and/or hard transitional beds soil, but not the advance outwash soil. <br /> The edge of footings should set back laterally at least 8 feet from the face of the slope, as <br /> shown on Plate 6. Water should not be allowed to accumulate in excavated footing <br /> trenches. Disturbed soils in footing trenches should be completely removed down to <br /> LW & ASSOCIATES, INC. <br />