Laserfiche WebLink
October 3, 2016 <br /> Single-Family Residence <br /> L&A Job No. 16-124 <br /> Page 20 <br /> Cleanouts <br /> Sufficient number of cleanouts at strategic locations should be provided for underground <br /> drain lines. The underground drain lines should be cleaned and maintained periodically <br /> to prevent clogging. <br /> RISK EVALUATION STATEMENT <br /> The project site is underlain at shallow depth by very-dense cemented glacial till and <br /> very-stiff to hard transitional beds deposits. These deposits are of very-high to high shear <br /> strength and the site should be quite stable if the recommendations in this report are fully <br /> implemented and observed during and following completion of construction. It is our <br /> opinion that the areas disturbed by construction will be stabilized and remain stable, and <br /> will not increase the potential for soil movement. In also our opinion that the risk for <br /> damages to the proposed development and from the development to adjacent properties <br /> from soil movement should be minimal. <br /> LIMITATIONS <br /> This report has been prepared for the specific application to this project for the exclusive <br /> use by Mr. Oliver Lewis, and his associates, representatives, consultants and contractors. <br /> We recommend that this report, in its entirety, be included in the project contract <br /> documents for the information of prospective contractors for their estimating and bidding <br /> purposes and for compliance with the recommendations in this report during construction., <br /> The conclusions and interpretations in this report, however, should not be construed as a <br /> warranty of subsurface conditions of the site. The scope of this investigation does not <br /> include services related to construction safety precautions and our recommendations are <br /> LFU & ASSOCIATES, INC. <br /> 2433 <br />