Laserfiche WebLink
LABELING DIjGRHV . MAIN SERVICE PANEL <br /> SOLAR LOAD CENTER- <br /> O2 IF USED TO COMBINE <br /> PV OUTPUT CIRCUTS <br /> O <br /> 12 <br /> AC DISCONNECT <br /> UTILITY METER o urelight Powe <br /> 11 O <br /> 10 <br /> 0 0 (INTERCONNECTED <br /> BREAKER) PURELIGHT POWER <br /> 3521 AVION DRIVE STE 200, <br /> 0 0 o O MEDFORD,OR 97504 <br /> _ CSLB:263801 <br /> NE:(541)816-4047 <br /> EMAIL:ADM IN@PUREE GHTPOWER.COM <br /> VERSION <br /> DATE DESIGNER <br /> DES 1 11/4/23 PATRICK VILLAFUERTE <br /> REV 1 <br /> REV 2 <br /> REV 3 <br /> REV41 <br /> Structural Stamp <br /> PV SYSTEM <br /> A WARNING 0 A CAUTION 10 RAPID SHUTDOWN • <br /> ELECTRICAL SHOCK HAZARD PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED • 1 <br /> TERMINALS ON LINE AND LOAD <br /> SIDES MAY BE ENERGIZED IN <br /> THE OPEN POSITION AHJ Stamp <br /> 5 <br /> WARNING <br /> 2 <br /> &VARNINGDUAL POWER SOURCE CONNECTION SOLAR PV SYSTEM EQUIPPED <br /> oSECOND SOURCE IS PHOTOVOLTAIC SYSTEM DO NOT RELOCATEWITH RAPID SHUTDOWN <br /> OVERCURRENT <br /> DEVICE <br /> Q <br /> p <br /> AWARNING Q o <br /> TURN RAPID SHUTDOWN w z LU o <br /> SWITCH TO THE OFF SOpV PANELSRIC LU o <br /> _ POSITION TO SHUT DOWN z Q UJ o 0 0 <br /> THIS EQUIPMENT FED BY C.'01 <br /> o = <br /> MULTIPLE SOURCES TOTAL PV SYSTEM AND REDUCE <br /> O •' SHOCK HAZARD IN THE w U) M 00 O <br /> RATING OF ALL OVERCURRENT NOMINALOPERATING • ARRAY. O z � CD <br /> DEVICES EXCLUDING MAIN POWER D' z it <br /> SUPPLY SHALL NOT EXCEED <br /> LU zd <br /> Q J <br /> AMPACITY OF BUSBAR <br /> 0 <br /> O • • • ' • • <br /> 0 • • 12 A WARNING <br /> SHEET NAME <br /> PARALLEL PHOTOVOLTAIC SYSTEM WARNING <br /> 11 GENERATION ON SITE , COMBINER PANEL LABELS <br /> DO NOT ADD LOADS SHEET NUMBER <br /> PV-7 <br />