Laserfiche WebLink
U N I RAC <br /> FLASHKIT PRO <br /> INSTALLATION GUIDE FEATURING®SHED&SEAL TECHNOLOGY <br /> FLASHKIT PRO IS THE COMPLETE FLASHING AND ATTACHMENT SOLUTION FOR COMPOSITION ROOFS. <br /> , o <br /> INSTALL FLASHKIT PRO FLASHING INSTALL L-FOOT ATTACH L-FOOTTO RAIL <br /> PRE-INSTALL •Drive the lag bolt down until the L-foot is held firmly in place. It is <br /> normal for the EPDM on the underside of the stainless steel backed <br /> •Locate roof rafters and snap chalk lines to mark the installation EPDM washer to compress and expand beyond the outside edge of <br /> point for each roof attachment. the steel washer when the proper torque is applied. <br /> •Drill a 7/32" pilot hole at each roof attachment. Fill each pilot hole TIP: <br /> with sealant. <br /> •Use caution to avoid over-torqueingthe lag bolt if using an impact driver. <br /> STEP 1 INSTALL FLASHKIT PRO FLASHING •Repeat Steps and 2 at each roof attachment point. <br /> -Add a U-shaped bead of roof sealant to the underside of the flashing STEP 3 ATTACH L--FOOT TO RAIL <br /> with the open side of the U pointing down the roof slope. Slide <br /> the aluminum flashing underneath the row of shingles directly up •Insert the included 3/8"-16 T-bolts into the lower slot on the Rail <br /> slope from the pilot hole as shown.Align the indicator marks on the (sold separately),spacing the bolts to match the spacing between <br /> lower end of the flashing with the chalk lines on the roof to center the roof attachments. <br /> the raised hole in the flashing over the pilot hole in the roof.When <br /> installed correctly,the flashing will extend under the two courses of •Position the Rail against the L Foot and insert the threaded end of <br /> shingles above the pilot hole. the T-Bolt through the continuous slot in the L-Foot.Apply anti-seize <br /> to bolt threads to prevent galling of the T-bolt and included 3/8" <br /> serrated flange nut. Place the 3/8" flange nut on the T-bolt and <br /> STEP 2 INSTALL L-FOOT finger tighten.Repeat STEP 3 until all L-Feet are secured to the Rail <br /> with a T-bolt.Adjust the level and height of the Rail and torque each <br /> •Fasten L-foot and Flashing into place by passing the included lag bolt to 30ft-lbs. <br /> bolt and pre-installed stainless steel-backed EPDM washer through <br /> the L-foot EPDM grommet,and the raised hole in the flashing, into <br /> the pilot hole in the roof rafter. <br /> FASTER 125—YEAR WARRANTY. <br /> 1 ' 11EITIOIS 1 ' CUSTOMER SERVICE VISIT U1IRA1.1OM1 ' CALL 11011211-2102 <br />