|
Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc.
<br /> Pacific Air Control, Inc. Maritime Institute
<br /> Bothell WA 98021 Pae 10
<br /> Room Detailed Loads At Room Peak Times
<br /> Load Radian
<br /> Description Unit U.Fac/ Conv. t Total Lat. Htg. Htg.
<br /> Quan Usage S.Gain S.Gain S.Gain Gain Mult. Loss
<br /> Room 1-100 Lobby peaks (sensible) in July at 4pm, Air Handler 1 (RTU-1), Zone 1, 16.0 x 14.0,
<br /> Construction Type: 8 (Exterior, Medium Construction, With Carpet, 50% Glass), SIDB: 70°F, WIDB:
<br /> 72°F
<br /> Roof-1-U P-Type:7 224 0.053 76 306 382 2.678 600
<br /> Wall-1-W-Type:18 83 0.053 16 31 47 2.683 221
<br /> Wall-2-S-Type:18 132 0.053 23 42 65 2.683 354
<br /> GIs-W-1-0%S 30.0 0.530 608 760 1,369 27.030 811
<br /> Unshaded Beam 30.0 0 0 0
<br /> GIs-S-1-0%S 30.0 0.530 155 318 472 27.030 811
<br /> Unshaded Beam 30.0 0 0 0
<br /> Lights-Prof=2 246 1.000 277 563 841
<br /> Equipment-Prof=2 224 1.000 611 153 764 0
<br /> People-Prof=2 3.0 1.000 315 435 750 600
<br /> Sub-total 4,691 600 2,797
<br /> Safety factors: +0% +0% +0%
<br /> --------- --------- ---------
<br /> Total w/ safety factors: 4,691 600 2,797
<br /> Room 2-101 Admin peaks (sensible) in July at 5pm, Air Handler 1 (RTU-1), Zone 1, 15.0 x 10.0,
<br /> Construction Type: 8 (Exterior, Medium Construction, With Carpet, 50% Glass), SIDB: 70°F, WIDB:
<br /> 72°F
<br /> Roof-1-UP-Type:7 150 0.053 53 222 274 2.678 402
<br /> Wall-1-W-Type:18 68 0.053 13 25 38 2.683 182
<br /> GIs-W-1-0%S 40.0 0.530 772 1,062 1,833 27.030 1,081
<br /> Unshaded Beam 40.0 0 0 0
<br /> Lights-Prof=2 165 1.000 186 377 563
<br /> Equipment-Prof=2 150 1.000 409 102 512 0
<br /> People-Prof=2 2.0 1.000 210 290 500 400
<br /> Sub-total 3,720 400 1,665
<br /> Safety factors: +0% +0% +0%
<br /> --------- --------- ---------
<br /> Total w/ safety factors: 3,720 400 1,665
<br /> Room 3-102 Vocational peaks (sensible) in September at 2pm, Air Handler 2 (RTU-2), Zone 1,
<br /> 40.0 x 19.0, Construction Type: 8 (Exterior, Medium Construction, With Carpet, 50% Glass), SIDB:
<br /> 70°F WIDB: 72°F
<br /> Roof-1-U P-Type:7 760 0.053 106 298 405 2.678 2,035
<br /> Wall-1-S-Type:18 195 0.053 30 59 88 2.683 523
<br /> Wall-2-W-Type:18 195 0.053 10 24 33 2.683 523
<br /> GIs-S-1-0%S 75.0 0.530 1,159 1,748 2,908 27.030 2,027
<br /> Unshaded Beam 75.0 0 0 0
<br /> S:\Engineering\Chvac 8 Projects\Maritime Institute.CH8 Monday, October 23,2023,01:54 PM
<br />
|