My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2520 MADISON ST SUNRISE CONVALESCENT CENTER 2025-08-08
>
Address Records
>
MADISON ST
>
2520
>
SUNRISE CONVALESCENT CENTER
>
2520 MADISON ST SUNRISE CONVALESCENT CENTER 2025-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 2:27:36 PM
Creation date
5/29/2024 12:45:09 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
2520
Tenant Name
SUNRISE CONVALESCENT CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ueoembof X68 Sedrcn 3 KP Design Page 3•-34 <br /> Miami;ReslaAs M Fire Sumession S temIEX4658) <br /> KOW 40z" <br /> let 4m". <br /> A Supply Lino Is the ,/BAR DrRcloa <br /> distribution piping that <br /> runs from the distributor v �� <br /> outlet or discharge fitting I <br /> to the first splitting too, �A++�N+a►rornts <br /> AG1�ilAtoll <br /> kP370 CIA&A ]t ASY <br /> HrfU11AsC MUM_ <br /> VOOUIi Om Wu.K <br /> A Supply Branch Lino PtneutA Nom <br /> (Including the last nozzle -Quer Nozzu <br /> txanch) Is the distribution nc ooencrart <br /> piping that runs from the <br /> first too at the hood to the - <br /> List nozzlo in the system — <br /> Incltxting all fittings used to AVo[ 1407A" _ <br /> exit the supply branch lino. /uuG�1VAATCR-Ij <br /> 01375 CYL#4: A ASY. <br /> PICLIVATIC 411EASE <br /> MOWLr OAS YALVE <br /> OUCT NOME <br /> A Nozzle Branch Lino is TU <br /> Na OElEctort <br /> the distribution piping that <br /> runs from the supply <br /> branch tow splttting to itw <br /> nozzles IIICIUding all Pi'PtJANC7E NorttES <br /> fittings used to exit the MAWAI <br /> supply txanch Ilno. ACIUAICIl1 <br /> KP376 CYIIWA ASY, <br /> : <br /> YOrLIO TIC RELEASE <br /> CAS VADA —"-- — - <br /> GENERAL PIPING REQUIREMENTS: <br /> 1. All pipe used for the distribution network must be schedule 40(black,chrome or <br /> stainless stool)pipe. <br /> 2. Piping limitations aro expressed in linear length of pipe, Linear piping Is the actual <br /> length of straight pipo used throughout the system. <br /> WARNING: GALVANIZED PIPE IS No ALLOWED <br /> 3. fAnxhnum flow point per cylinder. Modal 275- 8 f low points <br /> Modol 375 3 11 flaw points <br /> Model 475 0 14 flow points <br /> Model 600 = 18 flow points <br /> Twin 375= 22 flow points <br /> NOTE: THESE ARE EXAMPLES ONLY-OTHER CONFIGURATIONS CAN BE DESIGNED <br />
The URL can be used to link to this page
Your browser does not support the video tag.