Laserfiche WebLink
VERETT <br />0 <br />Permit Number: B2201-063 <br />Permit Inspections <br />City of Everett <br />Applied:1/28/2022 Approved:7/21/2022 <br />Issued: 8/3/2022 F i n a l e d: 8/21/2023 <br />Description: REMODEL OF SFR - POSSIBLE ADDITION <br />Site Address: 10209 1ST DR SE <br />City, State Zip Code: EVERETT, WA 98208-3963 <br />Status: FINALED Applicant: ELIZABETH CLAY <br />Parent Permit: W2110-008 Owner: STEELE ANDREW & CHRISTINA <br />Parent Project: Contractor: J L REMODELING INC <br />Details: <br />REMODEL OF SFR - POSSIBLE ADDITION <br />addition was added to the back of the house without permits and electrical and plumbing <br />See code case CE21-0928 <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT REMARKS <br />9/30/2022 <br />9/30/2022 <br />BLDG 01- <br />KURT KECK <br />CORRECTION <br />CONSULTATION <br />REQUIRED <br />Notes: <br />ANDREWSTEELE560@YAHOO.COM--541-499-3315--CONTRACTOR BACKED OUT-- <br />1. Provide approved set of plans on site <br />2. Contact front counter and set up Readiness Inspection <br />3. Remove drywall to expose at work that was done without inspection. <br />4. Schedule site readiness inspection when ready <br />PERMIT EXTENSION <br />2/8/2023 <br />=2/8/2023 <br />(REASON <br />AUDREY ARBOW <br />EXTENSION <br />SEE EXTENSION REQUEST IN <br />REQUIRED) <br />APPROVED <br />ATTACHMENTS <br />Notes: <br />6/8/2023 <br />6/8/2023 <br />BLDG - SITE <br />RAKEEB KHAN <br />NOT READY <br />READINESS CHECK <br />Notes: <br />paul@jlremodeling.com <br />Need plumbing and mechanical permits. Ceiling joists appears to be over spanning. Built up beam in attic does not have a support. New supports from <br />ridge board to ceiling beam added. Engineer or architect to provide calculations and detail of new beam and support including foundation. Fireproof all <br />top and bottom penetrations and any abandoned holes. <br />6/16/2023 <br />6/16/2023 <br />BLDG 02- <br />FOOTING/SETBACK <br />RAKEEB KHAN <br />APPROVAL <br />Notes: <br />2 spread footings in crawl. Ok to pour. Verify post base at framing inspection. <br />I <br />Printed: Wednesday, 27 September, 2023 1 of 3 rk <br />SUPERION <br />