Laserfiche WebLink
VERETT <br />0 <br />Permit Number: E2301-078 <br />Applied: 1/10/2023 <br />Issued: 1/11/2023 <br />Status: FINALED <br />Parent Permit: B2201-063 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:1/10/2023 <br />Finaled: 8/18/2023 <br />Details: <br />Panel/Service Change, Dedicated Circuit <br />Description: 200 AMP Panel/ Service Change, Dedicated Circuit for Hot <br />Tub <br />Site Address: 10209 1ST DR SE <br />City, State Zip Code: EVERETT, WA <br />Applicant: Penney Christianson <br />Owner: NEIL CHRISTINA\STEELE ANDREW D <br />Contractor: SEATOWN ELECTRIC(ELEC) CORP <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />1/24/2023 <br />1/25/2023 <br />ELEC 05-SERVICE <br />STEVE BANKS <br />APPROVAL <br />as noted <br />Notes: <br />1/16/2023 1:12 PM SEATOWN ELECTRIC(ELEC) CORP <br />Seatown tech on site is contact <br />Contact Name: Jarin Jones <br />Site Address: 10209 1ST DR SE <br />Phone:2533307499 <br />e-Mail: permits@seatownservices.com <br />Service only. Feeder and branch circuits not completed yet. Property is on Site Readiness Check for remodel without permits or inspections. This was <br />communicated with the owner and contractor. <br />6/8/2023 <br />6/8/2023 <br />ELEC - SITE <br />STEVE BANKS <br />NOT READY <br />READINESS CHECK <br />Notes: <br />paul@jlremodeling.com <br />Obtain all required city permits for building, plumbing, electrical, mechanical for work conducted beyond the scope of the initial permit. STOP ALL <br />WORK. Leave all work uncovered until inspected and approved by the city.Expose all unapproved work (including electrical, mechanical, plumbing, <br />utility, and framing systems etc.) installed/altered without permits and inspection approval. <br />ELEC - SITE <br />6/27/2023 <br />6/27/2023 <br />READINESS <br />STEVE BANKS <br />READY <br />RECHECK <br />Notes: <br />ryan@jlremodeling.com <br />6/27/2023 <br />6/27/2023 <br />ELEC 10-FINAL <br />STEVE BANKS <br />CORRECTION <br />REQUIRED <br />Notes: <br />Provide, handle ties for both wires on opposite phase for the multi wire branch circuit. Finished labeling, the panel. Provide physical protection for the <br />liquid tight conduit on the ground to the hot tub. Provide overcurrent protection that is proper to the nameplate rating of the hot tub 35 amps max.. <br />I <br />Printed: Friday, 18 August, 2023 1 of 2 rk <br />SUPERION <br />