My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 99 5-04.3 Construction Requirements 1 2 5-04.3(1) Weather Limitations 3 Do not place HMA for wearing course on any Traveled Way beginning October 1st 4 through March 31st of the following year without written concurrence from the Engineer. 5 6 Do not place HMA on any wet surface, or when the average surface temperatures are 7 less than those specified below, or when weather conditions otherwise prevent the 8 proper handling or finishing of the HMA. 9 10 Minimum Surface Temperature for Paving 11 Compacted Thickness (Feet) Wearing Course Other Courses Less than 0.10 55◦F 45◦F 0.10 to .20 45◦F 35◦F More than 0.20 35◦F 35◦F 12 5-04.3(2) Paving Under Traffic 13 When the Roadway being paved is open to traffic, the requirements of this Section 14 shall apply. 15 16 The Contractor shall keep intersections open to traffic at all times except when paving 17 the intersection or paving across the intersection. During such time, and provided that 18 there has been an advance warning to the public, the intersection may be closed for the 19 minimum time required to place and compact the mixture. In hot weather, the Engineer 20 may require the application of water to the pavement to accelerate the finish rolling of the 21 pavement and to shorten the time required before reopening to traffic. 22 23 Before closing an intersection, advance warning signs shall be placed and signs shall 24 also be placed marking the detour or alternate route. 25 26 During paving operations, temporary pavement markings shall be maintained throughout 27 the project. Temporary pavement markings shall be installed on the Roadway prior to 28 opening to traffic. Temporary pavement markings shall be in accordance with Section 8-29 23. 30 31 All costs in connection with performing the Work in accordance with these requirements, 32 except the cost of temporary pavement markings, shall be included in the unit Contract 33 prices for the various Bid items involved in the Contract. 34 35 5-04.3(3) Equipment 36 37 5-04.3(3)A Mixing Plant 38
The URL can be used to link to this page
Your browser does not support the video tag.