My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 103 When the surface of the existing pavement or old base is irregular, the Contractor shall 1 bring it to a uniform grade and cross-section as shown on the Plans or approved by the 2 Engineer. 3 4 Preleveling of uneven or broken surfaces over which HMA is to be placed may be 5 accomplished by using an asphalt paver, a motor patrol grader, or by hand raking, as 6 approved by the Engineer. 7 8 Compaction of preleveling HMA shall be to the satisfaction of the Engineer and may 9 require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to 10 avoid bridging across preleveled areas by the compaction equipment. Equipment used 11 for the compaction of preleveling HMA shall be approved by the Engineer. 12 13 Before construction of HMA on an existing paved surface, the entire surface of the 14 pavement shall be clean. All fatty asphalt patches, grease drippings, and other 15 objectionable matter shall be entirely removed from the existing pavement. All 16 pavements or bituminous surfaces shall be thoroughly cleaned of dust, soil, pavement 17 grindings, and other foreign matter. All holes and small depressions shall be filled with an 18 appropriate class of HMA. The surface of the patched area shall be leveled and 19 compacted thoroughly. Prior to the application of tack coat, or paving, the condition of 20 the surface shall be approved by the Engineer. 21 22 A tack coat of asphalt shall be applied to all paved surfaces on which any course of HMA 23 is to be placed or abutted; except that tack coat may be omitted from clean, newly paved 24 surfaces at the discretion of the Engineer. Tack coat shall be uniformly applied to cover 25 the existing pavement with a thin film of residual asphalt free of streaks and bare spots at 26 a rate between 0.02 and 0.10 gallons per square yard of retained asphalt. The rate of 27 application shall be approved by the Engineer. A heavy application of tack coat shall be 28 applied to all joints. For Roadways open to traffic, the application of tack coat shall be 29 limited to surfaces that will be paved during the same working shift. The spreading 30 equipment shall be equipped with a thermometer to indicate the temperature of the tack 31 coat material. 32 33 Equipment shall not operate on tacked surfaces until the tack has broken and cured. If 34 the Contractor’s operation damages the tack coat it shall be repaired prior to placement 35 of the HMA. 36 37 The tack coat shall be CSS-1, or CSS-1h emulsified asphalt. The CSS-1 and CSS-1h 38 emulsified asphalt may be diluted once with water at a rate not to exceed one part water 39 to one part emulsified asphalt. The tack coat shall have sufficient temperature such that 40 it may be applied uniformly at the specified rate of application and shall not exceed the 41 maximum temperature recommended by the emulsified asphalt manufacturer. 42 43 5-04.3(4)A Crack Sealing 44 45 5-04.3(4)A1 General 46 When the Proposal includes a pay item for crack sealing, seal all cracks ¼ inch in width 47 and greater. 48
The URL can be used to link to this page
Your browser does not support the video tag.