My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 111 1 If a constituent is not measured in accordance with these Specifications, its individual 2 pay factor will be considered 1.00 in calculating the Composite Pay Factor (CPF). 3 4 5-04.3(10) HMA Compaction Acceptance 5 HMA mixture accepted by nonstatistical evaluation that is used in traffic lanes, including 6 lanes for intersections, ramps, truck climbing, weaving, and speed change, and having a 7 specified compacted course thickness greater than 0.10-foot, shall be compacted to a 8 specified level of relative density. The specified level of relative density shall be a 9 Composite Pay Factor (CPF) of not less than 0.75 when evaluated in accordance with 10 Section 1-06.2, using a LSL of 92.0 (minimum of 92 percent of the maximum density). 11 The maximum density shall be determined by WSDOT FOP for AASHTO T 729. The 12 specified level of density attained will be determined by the evaluation of the density of 13 the pavement. The density of the pavement shall be determined in accordance with 14 WSDOT FOP for WAQTC TM 8, except that gauge correlation will be at the discretion of 15 the Engineer, when using the nuclear density gauge and WSDOT SOP 736 when using 16 cores to determine density. 17 18 Tests for the determination of the pavement density will be taken in accordance with the 19 required procedures for measurement by a nuclear density gauge or roadway cores after 20 completion of the finish rolling. 21 22 If the Contracting Agency uses a nuclear density gauge to determine density the test 23 procedures FOP for WAQTC TM 8 and WSDOT SOP T 729 will be used on the day the 24 mix is placed and prior to opening to traffic. 25 26 Roadway cores for density may be obtained by either the Contracting Agency or the 27 Contractor in accordance with WSDOT SOP 734. The core diameter shall be 4-inches 28 minimum, unless otherwise approved by the Engineer. Roadway cores will be tested by 29 the Contracting Agency in accordance with WSDOT FOP for AASHTO T 166. 30 31 If the Contract includes the Bid item “Roadway Core” the cores shall be obtained by the 32 Contractor in the presence of the Engineer on the same day the mix is placed and at 33 locations designated by the Engineer. If the Contract does not include the Bid item 34 “Roadway Core” the Contracting Agency will obtain the cores. 35 36 For a lot in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s 37 request after the Engineer is satisfied that material conforming to the Specifications can 38 be produced. 39 40 HMA mixture accepted by commercial evaluation and HMA constructed under conditions 41 other than those listed above shall be compacted on the basis of a test point evaluation 42 of the compaction train. The test point evaluation shall be performed in accordance with 43 instructions from the Engineer. The number of passes with an approved compaction 44 train, required to attain the maximum test point density, shall be used on all subsequent 45 paving. 46 47
The URL can be used to link to this page
Your browser does not support the video tag.