My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 127 1Calculated as the weight of asphalt binder contributed from the RAP as a percentage of the total weight of asphalt binder in the mixture. 2Calculated as the weight of asphalt binder contributed from the RAS as a percentage of the total weight of asphalt binder in the mixture. 1 6. Develop the mix design including RAP, RAS, recycling agent, and 2 new binder. 3 4 7. Extract, recover, and test the asphalt residue from the RAP and 5 RAS stockpiles to determine the percent of recycling agent and/or 6 grade of new asphalt binder needed to meet but not exceed the 7 performance grade (PG) of asphalt binder required by the 8 Contract. 9 10 a. Perform the asphalt extraction in accordance with AASHTO T 11 164 or ASTM D 2172 using reagent grade solvent. 12 13 b. Perform the asphalt recovery in accordance with AASHTO R 14 59 or ASTM D 1856. 15 16 c. Test the recovered asphalt residue in accordance with 17 AASHTO R 29 to determine the asphalt binder grade in 18 accordance with Section 9-02.1(4). 19 20 d. After determining the recovered asphalt binder grade, 21 determine the percent of recycling agent and/or grade of new 22 asphalt binder in accordance with ASTM D 4887. 23 24 e. Test the final blend of recycling agent, binder recovered from 25 the RAP and RAS, and new asphalt binder in accordance with 26 AASHTO R 29. The final blended binder shall meet but not 27 exceed the performance grade of asphalt binder required by 28 the Contract and comply with the requirements of Section 9-29 02.1(4). 30 31 8. Include the following test data with the mix design submittal: 32 33 a. All test data from RAP and RAS stockpile construction. 34 35 b. A Safety Data Sheet (SDS) and documentation that no 36 asbestos has been added during production of the 37 manufactured waste shingles as detailed in Section 9-38 03.21(1). 39 40 c. All data from testing the recovered and blended asphalt 41 binder. 42 43 9. Include representative samples of the following with the mix 44 design submittal: 45 46
The URL can be used to link to this page
Your browser does not support the video tag.