Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 158 DIVISION8.GR8 1 Division 8 2 Miscellaneous Construction 3 4 8-01.GR8 5 Erosion Control and Water Pollution Control 6 7 8-01.3.GR8 8 Construction Requirements 9 10 8-01.3(2).GR8 11 Temporary Seeding and Mulching 12 13 8-01.3(2)A.DOCX 14 Preparation for Application 15 16 8-01.3(2)A.INST1.DOCX 17 Section 8-01.3(2)A is supplemented with the following: 18 19 8-01.3(2)A.OPT1.DOCX 20 (******) 21 Unwanted vegetation in any area to be seeded shall be controlled according to 22 the requirements of Section 8-02.3(3) prior to seeding. 23 24 Areas requiring seeding which become compacted due to construction use, 25 including but not limited to staging areas and access roads, shall be loosened 26 and cultivated and amended to a minimum depth of 12 inches prior to seeding 27 operations pursuant to Soil Restoration Detail on Planting Plans. 28 29 No cultivation shall occur in areas within the drip line of existing vegetation 30 scheduled to remain. 31 32 8-01.3(2)B.GR8 33 Temporary Seeding 34 35 8-01.3(2)B.INST1.GR8 36 Section 8-01.3(2)B is supplemented with the following: 37 38 8-01.3(2)B.OPT4.DOCX 39 (******) 40 Grass seed, of the following composition, proportion, and quality shall be applied 41 at the rates shown below on all exposed soil areas outside of landscape planting 42 areas: 43 44 Kind and Variety of 45 Seed in Mixture by 46 Common Name and 47 (Botanical name) % Weight % Purity % Germination 48 Redtop 20 92 85 49