My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 173 base and on the down stream side of traffic flow. A grounding nut or provision in the 1 handhole frame for accommodating a threaded bolt for the purpose of attaching 2 grounding connector shall be provided on the inside of the shaft. 3 4 All street lighting pole shafts shall be round and tapered unless otherwise noted on the 5 plans or approved by the Engineer. Material for aluminum poles shall be natural polished 6 aluminum. 7 8 All bolts, nuts, screws, and washers, but not including anchor bolts and unless otherwise 9 specifically designated herein, shall be stainless steel. 10 11 The luminaire arms shall have a nominal length as shown on the plans measured from 12 the centerline of the shaft. The outer portion of the arm shall be nearly horizontal to plus 13 5o above horizontal and shall be furnished with a 1-1/2" to 2" O.D. tenon with a maximum 14 length of 10" to fit the luminaires specified herein. 15 16 Foundations for street lights shall be in accordance with City of Everett Standard Plan 17 812. 18 19 Complete calculations for structural design shall be submitted with the shop drawings for 20 approval before fabrication or ordering material. These calculations shall include the 21 stresses in the pole and mast arms, the deflections at the free end of the mast arm, the 22 attachment of the luminaires to the structure, the connection between the mast arms and 23 vertical pole, pole section at handholes, base plate, anchor bolts, and foundation. The 24 submittal shall include the material specifications and details of the foundation and anchor 25 bolts. 26 27 9-29.6(5) Foundation Hardware 28 29 The first paragraph of Section 9-29.6(5) is revised to read: 30 31 Anchor bolts for Type PPB, PS, I, FB, and RM signal standards shall conform to the 32 requirements of ASTM F1554, grade 55. Nuts shall meet the requirements of 33 AASHTO M 291, grade A. Washers shall meet the requirements of ASTM F 844 or 34 ASTM F 436. 35 36 CNH 8-20.2(9-29.6).OPT 5 SIGNAL STANDARDS.DOCX 37 Traffic Signal Standards 38 Traffic signal standards shall be furnished and installed in accordance with the 39 methods and materials noted in the applicable Standard Plans, pre-approved plans, 40 or special design plans. 41 42 All welds shall comply with the latest AASHTO Standard Specifications for Structural 43 Supports for Highway Signs, Luminaires and Traffic Signals. Welding inspection 44 shall comply with Section 6-03.3(25)A Welding Inspection. 45 46 Hardened washers shall be used with all signal arm connecting bolts instead of 47 lockwashers. All signal arm ASTM A 325 connecting bolts tightening shall comply 48 with Section 6-03.3(33). 49 50 Traffic signal standard types and applicable characteristics are as follows: 51 52
The URL can be used to link to this page
Your browser does not support the video tag.