My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 30 1-07.2(3) Services 1 2 The Contractor shall not collect retail sales tax from the Contracting Agency on any 3 contract wholly for professional or other services (as defined in Washington State 4 Department of Revenue Rules 138 and 244). 5 6 1-07.4.GR1 7 Sanitation 8 9 1-07.4(2).GR1 10 Health Hazards 11 12 1-07.4(2).INST1.GR1 13 Section 1-07.4(2) is revised to read: 14 15 1-07.4(2).OPT1.FR1.DOCX 16 (August 7, 2017) 17 This project site is known to be occupied by transients and therefore contains 18 biological hazards and associated physical hazards. These may include, but not be 19 limited to violent and dangerous individuals, hypodermic needles, garbage, broken 20 glass, human and animal excrement, drug paraphernalia, and other hazards. 21 22 The Contractor shall take precautions and perform any necessary Work required to 23 provide and maintain a safe and healthful jobsite for all workers and the public for 24 the duration of the project in accordance with all applicable laws and contract 25 requirements. 26 27 The Contractor shall ensure that the public, including persons who may be non-28 English speaking or those who may not be able to recognize potential safety and 29 health hazards within the project area, are not harmed by the Contractors activities. 30 31 Nothing required by this Specification shall operate as a waiver of the Contractor’s 32 responsibility for taking all steps necessary to ensure the safety of the public under 33 Section 1-07.23 or responsibility for liability and damages under Section 1-07.14 or 34 for any other responsibility under the Contract or as may be required by law. 35 36 Health and Safety Plan 37 The Contractor shall prepare a written Health and Safety Plan. The plan shall 38 be prepared under the supervision of a certified industrial hygienist and shall 39 incorporate all required County, State, and Federal health and safety provisions. 40 The plan shall include requirements of the Federal Occupational Safety and 41 Health Act of 1970 (OSHA), all amendments, and all other applicable health 42 regulations. 43 44 Preparation of the Health and Safety Plan shall include an initial site assessment 45 by the industrial hygienist. The plan shall break initial cleanup of the project into 46 identifiable construction areas. The plan shall be submitted to the Engineer prior 47 to commencing cleanup Work. At least one copy of the plan shall be posted at 48 the work site while cleanup Work is in progress. The industrial hygienist shall 49 perform one or more follow-up site assessments as needed to approve the site 50 following completion of the initial site cleanup. 51 52
The URL can be used to link to this page
Your browser does not support the video tag.