My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 51 subcontractor is selected over a DBE for Work on the Contract. (ref. 1 updated DBE regulations – 26.53(b)(2)(vi) & App. A) 2 3 Administrative Reconsideration of GFE Documentation 4 A Bidder has the right to request reconsideration if the GFE documentation submitted 5 with their Bid was determined to be inadequate. 6 7 • The Bidder must request within 48 hours of notification of being 8 nonresponsive or forfeit the right to reconsideration. 9 10 • The reconsideration decision on the adequacy of the Bidder’s GFE 11 documentation shall be made by an official who did not take part in the 12 original determination. 13 14 • Only original GFE documentation submitted as a supplement to the Bid 15 shall be considered. The Bidder shall not introduce new documentation at 16 the reconsideration hearing. 17 18 • The Bidder shall have the opportunity to meet in person with the official for 19 the purpose of setting forth the Bidder’s position as to why the GFE 20 documentation demonstrates a sufficient effort. 21 22 • The reconsideration official shall provide the Bidder with a written decision 23 on reconsideration within five working days of the hearing explaining the 24 basis for their finding. 25 26 DBE Bid Item Breakdown 27 The Bidder shall submit a DBE Bid Item Breakdown Form (WSDOT Form 272-054) 28 as specified in the Special Provisions for Section 1-02.9, Delivery of Proposal. 29 30 DBE Trucking Credit Form 31 The Bidder shall submit a DBE Trucking Credit Form (WSDOT Form 272-058), as 32 specified in the Special Provisions for Section 1-02.9, Delivery of Proposal. 33 34 Note: The DBE Trucking Credit Form is only required for a DBE Firm listed on 35 the DBE Utilization Certification as a subcontractor for “Trucking” or 36 “Hauling” and are performing a part of a bid item. For example, if the 37 item of Work is Structure Excavation including Haul, and another firm is 38 doing the excavation and the DBE Trucking firm is doing the haul, the 39 form is required. For a DBE subcontractor that is responsible for an 40 entire item of work that may require some use of trucks, the form is not 41 required. 42 43
The URL can be used to link to this page
Your browser does not support the video tag.